Ahmedabad Metro: Project Information, Routes, Fares and Other Details

Project Summary

  • Name of Project: Ahmedabad Metro Rail Project
  • Authority: Gujarat Metro Rail Corporation Limited (GMRC)
  • Type of Project: MRTS
  • Project Cost: Rs16,157.17 Crore
  • Total Network:68.28 km
  • No. of Phases/Lines: 2 (Two Lines)
  • Start Date of Operation: March 4, 2019
  • Target: 2025
  • Current Status: Partially Operational

Ahmedabad Metro Rail Phase-I Network (40.03 km)

Line 1 (East-West Corridor): Vastral Gam – Thaltej Gam

Operational Network: 6.5 km (Vastral Gam – Apparel Park) | Stations: 06

  • Total Length: 21.16 km
  • No. of Stations: 17 Stations
  • Station Names: Vastral Gam, Nirant Cross Road, Vastral, Rabari Colony, Amraiwadi and Apparel Park, Kankaria East, Kalupur Railway Station, Ghee Kanta, Shahpur, Old High Court, Stadium, Commerce Six Road, Gujarat University, Gurukul Road, Doordarshan Kendra and Thaltej Gam.
  • Depot: Apparel Park

Line 2 (North-South Corridor): Motera Stadium – APMC

  • Total Length: 18.87 km
  • No. of Stations: 15 Stations
  • Proposed Stations: Motera Stadium, Sabarmati, AEC, Sabarmati Railway Station,  Ranip, Vadaj, Vijaynagar, Usmanpura, Old High Court, Gandhigram, Paldi, Shreyas, Rajivnagar, Jivraj Park, APMC.
  • Depot: Gyaspur

Ahmedabad Metro Phase-II (28.254 km)

Line 2 Extension: Motera Stadium to Mahatma Mandir – 22.84 km

  • Total length: 22.84 km
  • No. of Stations: 20
  • Proposed Stations: (Motera Stadium), Koteshwar Road, Vishwakarma College, Tapovan Circle, Narmada Canal, Koba Circle, Juna Koba, Koba Gam, GNLU, Raysan, Randesan, Dholakuva Circle, Infocity, Sector 1, Sector 10A, Sachivalaya, Akshardham, Juna Sachivalaya, Sector 16, Sector 24, Mahatma Mandir.
  • Depot: Gyaspur

Line 2 Extension: GNLU to GIFT City

  • Total length: 5.416 km
  • No. of Stations: 2
  • Proposed Stations: PDPU, GIFT City

Project Cost & Funding

  • Project Cost: Phase 1 Rs 10,773 crore, Phase 2 Rs 5,384 crore
  • Funding Agency: JICA
  • Equity Share: Govt. of Gujarat, Govt. of India

System Specifications

  • Rolling Stock: Design Speed 80 kmph (Average Speed: 33kmph), 3-Coach Trains, Passenger Capacity-782
  • Track Gauge: Standard Guage (1,435 mm)
  • Electrification:  750 V DC Third Rail
  • Signalling: CBTC (Communication Based Train Control)

Major Contracts

Civil Contracts

  • Systra-RITES-Oriental-AECOM JV: General Consultancy (Phase 1)
  • URC Construction: Construction of Apparel Park Depot
  • Gannon Dunkerly – PSPO JV: Construction of Gyaspur Depot

System Contracts

  • Rolling Stock: Hyundai Rotem (96 Coaches)
  • Signalling: Nippon Signal Co. Ltd, Japan

Operator

  • Gujarat Metro Rail Corporation Limited  Block No.1, First Floor, Karmayogi Bhavan, Sector 10/A, Gandhinagar-382010.
  • Website: https://www.gujaratmetrorail.com/
  • Passenger Helpline No: 7923248572/73

 

 

Route Map