Kochi Metro: Project Information, Routes, Fares and Other Details

Project Summary

  • Name of Project: Kochi Metro Rail Project
  • Authority: Kochi Metro Rail Limited (KMRL)
  • Type of Project: MRTS
  • Project Cost: INR 5181.79 Crores (Phase-I)
  • Total Network: 23.65 km
  • No. of Phases/Lines: 3 (2 Line)
  • Start Date of Operation: 17 June 2017

Kochi Metro Rail Network (Phase I)

Total Lenght: 27.6 km | Operational Stations: (Aluva-Petta)

Aluva – Petta – SN Junction

  • Total Length: 27.6 km
  • No. of Stations: 24 Stations
  • Station Names: 
  • Aluva, Pulinchodu, Companypady, Ambattukavu, Muttom, Kalamassery, Cochin University, Pathadipalam, Edapally, Changampuzha Park, Palarivattom, JLN Stadium, Kaloor, Lissie, M.G Road, Maharaja’s College, Ernakulam South, Kadavanthra, Elamkulam, Vytila, Thykkoodam and Petta. Vadakkekotta, SN Junction
  • Depote: Muttom

Kochi Metro Rail Network (Phase II)

Jawahar Lal Nehru Stadium – Info Park

  • Total Length:  23.5 km
  • No. of Stations: 21 Stations
  • Proposed Station Names: Palarivattom Junction, Palarivattom Signal, Chembumukku, Vazhakkala, Kunnumpuram, Kakkanad Junction, Kochi Special Economic Zone, Chittethukara, Rajagiri, Info Park I, Info Park II.

Phase III: Aluva – Angamaly (Airport Extension)

Operaters

  • Kochi Metro Rail Limited (KMRL) JLN Metro Station, 4th Floor, Kaloor, Ernakulam, Kerala 682017
  • Website: https://kochimetro.org/

  • Passenger Helpline No: 0484-2846700