Project Summary

  • Name of Project: Noida Metro Rail Project
  • Authority: Noida Metro Rail Corporation Limited
  • Type of Project: MRTS
  • Project Cost: INR 5,503 Crore (Phase-I)
  • Total Network: 99.7 km,(22.9 Operational-70Km Planed)
  • No. of Phases/Lines: 2(2 Line)
  • Start Date of Operation: 25 January 2019
  • Target: 2025

Noida Metro Rail Network (Phase I)

Line 1 (Aqua Line): Noida City Centre – Depot Station

  • Total Length: 29.707 km (Operational)
  • No. of Stations: 22 (All elevated)
  • Station Names:Noida City Centre, Sector-71, Sector-50, Sector-78, Sector-101, Sector-81, Dadri Road, Sector-83, Sector-137, Sector-142, Sector-143, Sector-144, Sector-147, Sector-153, Sector-146, Sector-149, Knowledge Park-II, Knowledge Park-I, Pari Chowk, Alpha-I, Alpha-II, Delta-I, Depot.

Noida Metro Rail Network (Phase II)

Line 1 Extension (Aqua Line): Noida Sec 71 – Knowledge Park V

  • Total Length: 14.958 km
  • No. of Stations: 9 Stations
  • Station Names: Sector 122, Sector 123, Sector 4, Ecotech 12, Sector 2, Sector 3, Sector 10, Sector 12 and Knowledge Park V¬†

Line 2: Noida Sector 142 – Botanical Garden

  • Total Length: 14 km
  • No. of Stations: 10Stations
  • Station Names: Sector 142, Sector 136, Sector 91, Sector 93, Sector 98, Sector 127, Sector 97, Sector 126, Sector 125, Sector 94, [Botanical Garden].

Operaters

  • ¬†Noida Metro Rail Corporation Limited Software Technology Parks of India (STPI), Sector 29, Noida, Uttar Pradesh 201303
  • Website: https: https: //www.nmrcnoida.com/
  • Passenger Helpline No: 120-2450663/64/65