STUP Consultants Wins Station Design Consultancy Contract for Thane Metro Rail Project
Larsen & Toubro bags Design-and-Build Contracts for Bangladesh’s Dhaka Metro Line 1 Project
Wabtec Corporation awarded ₹839 crore contract for India's Vande Bharat Sleeper Train Project
How Indigenous Engineering and Japanese Technology are transforming India's first Bullet Train?
India's Metro Rail Network set to cross 2000-km mark soon, become second largest in World
Alstom to deploy DTG Signalling System for Jaipur Metro’s 5.2-km Phase-1 Extension
RVNL floats ₹297.45-crore Power Systems Tender for Kolkata Metro Purple Line
Siemens Mobility awarded $772 million Trainset Contract for California High-Speed Rail Project
RITES submits fresh DPR to UPMRC for ₹12,000 crore Prayagraj Metro Rail Project
Paras Railtech wins ₹84.72 crore Ballastless Track Contract for Jaipur Metro Rail Project
Kolkata, India (Metro Rail Today): The West Bengal Housing and Infrastructure Development Corporation is exploring new options for starting monorail services in Salt Lake and New Town, for the ease of commute of the rising population in this part of the city. The service will focus on those areas which are not being covered by the ongoing Metro service. The cost evaluation of the project has been completed and HIDCO is now looking for investors.
The alignment of the monorail services will start from Ultadanga and will run through Sector 1 and Sector III in Salt Lake and will reach New Town. The two metro networks currently under development- the East West corridor and the Garia- Kolkata Airport Metro will not be able to cover the entire Salt Lake and New Town region. The estimated cost of the entire project is Rs 4,500 crores.
The Monorail type light rail transit system connecting New Town Action Area III with Biswa Bangla gate (Narkelbagan) crossing located at the 3rd intersection on Biswa Bangla Sarani for a synchronised connectivity link with the Metro alignment.
HIDCO officials has asked an agency, which earlier had given a presentation, to furnish the LRT plan in detail for HIDCO to examine the proposal.
HIDCO had earlier prepared a concept plan of setting up a monorail or personalised transport system or ropeway type of transport system to improve intercity connectivity in New Town. The Metro alignment which is coming up will be passing only through Action Area I and II. The idea is to have a last mile connectivity link for AA III where several IT companies are coming up.
HIDCO officials said one agency recently came up with a proposal, which was placed before the Hidco board, saying that they would not seek any funding from the government for setting up a monorail system. "The agency proposed they will mobilise funds from other projects and will utilise the money to develop the monorail plan. The agency has been asked to give a detailed project report, showing us the proposed route, alignment and length where the LRT system could be set up from AA III to near Narkelbagan crossing. Once the agency gives us the detailed project proposal expectedly by this year, we would examine the proposal," said a Hidco official, reported TOI.