Alstom powers Delhi Metro's Pink and Magenta Line with Driverless Trains and CBTC Signalling
South India's 744-km Chennai–Hyderabad Bullet Train Corridor set to transform connectivity
TDC Contracting bags ₹92.10 Crore E&M Systems Contract for Chennai Metro Phase 2 Corridor 3
Bids Invited for 5-Year Rolling Stock Maintenance Contract for Navi Mumbai Metro Line 1
Madhya Pradesh plans to expand Indore Metro to Ujjain, Pithampur and Mhow
Punjab approves 27-km long Pakistan’s first fully underground Lahore Blue Line Metro Project
Tec4 Ingenieros-led JV appointed as Independent Engineer for ₹1,016 Crore BKC Pod Taxi Project
MMRDA to appoint General Consultant for ₹4,063 Crore Mumbai Metro Line 5A Extension
Railway proposes 50-Year Concession Period and Land Acquisition Support to boost PPP Projects
BHEL vs Siemens, ABB and Medha: A Case Study in Technology Ownership and Industrial Strategy| Project Name | Network | Operational | U/Construction | Project Cost | Project Details |
|---|---|---|---|---|---|
| Bengaluru Suburban Rail | 174.91 km | 56.1 km | 118.8 km | ₹ 58,193 crore | Read More |