SYSTRA–led JV wins ₹228.78 crore Design Consultancy Contract for two 350 kmph Bullet Train Corridors
Paras Railtech wins ₹84.72 crore Ballastless Track Contract for Jaipur Metro Phase 1C Project
SYSTRA India wins DPR Consultancy Contract for Chennai Metro Phase II Corridor 5 Extension
BEML plans manufacturing of Tunnel-Boring Machines for upcoming Rail & Infra projects in India
PM Narendra Modi inaugurates 7.5-km elevated stretch of Bangalore Metro Pink Line
Dilip Buildcon wins ₹419.47 crore Civil Contract for Gurugram Metro Depot and Workshop Project
Govt of India approves ₹2,390 crore Noida Metro Aqua Line Extension to Greater Noida West
Hitendra Malhotra appointed as Member (Traction & Rolling Stock) in Railway Board
UAE approves US$544.6 million Dubai Metro Extension to Al Maktoum International Airport
KINET Railway's 24-coach Vande Bharat Sleeper Train Prototype may miss March 2027 deadline
Chennai, India (Rail & Metro Today): SYSTRA MVA Consulting (India) Private Limited has emerged as the lowest bidder (L1) for preparing the Detailed Project Report (DPR) for the proposed extension of Chennai Metro Rail Limited’s (CMRL) Phase II Corridor 5 from Assisi Nagar to Wimco Nagar.
The company quoted ₹59.95 lakh for the consultancy assignment, according to the financial bid results. The tender attracted two bids, with both participating companies found technically compliant and eligible for financial evaluation.
Under the financial evaluation, SYSTRA MVA Consulting secured the L1 position with an offer of ₹59.95 lakh. Balaji Railroad Systems Private Limited (BARSYL) emerged as the second-lowest bidder (L2), quoting ₹63 lakh, approximately 5.1% higher than SYSTRA’s offer.
The procurement follows the Least Cost Selection (LCS) method. The quoted amounts are exclusive of Goods and Services Tax (GST).
The financial bids were opened on November 14, 2026. The tender is identified by Tender ID 2026_CMRL_920265_1.
The consultancy assignment relates to the preparation of a Detailed Project Report for extending Phase II Corridor 5 from Assisi Nagar to Wimco Nagar. A DPR is an important planning document that evaluates the proposed infrastructure development and provides the technical and project-planning basis for subsequent decision-making.
The proposed extension is expected to be examined as part of Chennai’s broader metro rail expansion planning. However, details such as the proposed extension's length, station locations, project cost and implementation timeline have not been specified in the available tender result information.
With both bidders declared technically compliant and the financial evaluation identifying SYSTRA MVA Consulting as L1, the procurement process has reached an important milestone.
However, the L1 position does not amount to a formal contract award. CMRL will need to complete the prescribed evaluation and approval formalities before issuing the letter of acceptance and confirming the appointment of the consultant.
The DPR will provide the planning foundation for assessing the proposed Corridor 5 extension and its role in strengthening Chennai’s wider metro connectivity.