Assam Govt Cabinet approves four-phase Guwahati Metro Rail Project with ₹18,000 crore Investment
RITES awarded DPR Contract for 55-km Nagpur Metro Phase 3 Expansion with Four New Corridors
Mumbai Metro One secures ₹2,771 crore Debt Restructuring, Insolvency proceedings set to end
TBM Durga achieves major tunnel breakthrough at Victoria for Kolkata Metro Purple Line Expansion
UPMRC floats ₹670 Crore Rolling Stock Tender for 45 Metro Cars for Lucknow Metro Phase 1B
Maha Metro launches ₹994.78 crore Rolling Stock Tender for Nagpur and Pune Metro Phase 2
Afcons Infrastructure wins ₹1,045 crore Civil Contract for Ramwadi–Wagholi Metro Corridor in Pune
6th RailTrans Expo 2026 concludes on a Grand Note, Reinforcing India's Vision for Viksit Rail 2047
Keralam High-Speed Rail proposal is technically feasible but project cost may double: Expert Panel
DMRC begins Construction work on Inderlok–Indraprastha Corridor under Delhi Metro Phase 4 Expansion
In the bustling urban landscape of Ahmedabad, India, an ambitious transformation is underway with the development of an extensive metro rail network. With two of metro rail lines spanning a combined length of 68.28 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 16,157.17 cr., this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Ahmedabad Metro project was started on 06 March 2019 and the system is now covering a total of 68.28 km with two lines. By the end of 2025, the Ahmedabad Metro will cover a total network of 68.28 kilometers.
#1 Blue Line: Vastral Gam - Thaltej Gam (21.16 km) Operational
#2 Red Line: Motera stadium - Gift City (47.12 km) Partially Operational
Line 1:Blue (East-West Corridor): Vastral Gam - Thaltej Gam
Line 2: Red (North-South Corridor): Motera Stadium - APMC
Line-2 Red (North-South): Motera Stadium – Mahatma Mandir
Line-2: Red (Branch Line, Eastern Spur): Gujarat National Law University – Gujarat International Finance Tec-City (GNLU – GIFT City)
Phase I - Line 1 (Blue) - Apparel Park (Operational)
Phase I - Line 2 (Red) - Gyaspur (Operational)
Phase II - Line 2 (Red) - Indroda (Under Construction)
Up to 7.5 km - ₹ 10
Above 7.5 and Up to 21 km - ₹ 25
079-22960123
Gujarat Metro Rail Corporation Limited
Corporate Office: 803, 8th Floor, GNFC Info Tower,
Sarkhej, Gandhinagar Highway, Bodakdev,
Ahmedabad – 380054, Gujarat, India
Email: care@gujaratmetrorail.com
Website: www.gujaratmetrorail.com