Titagarh Rail Systems Bags ₹273.24-Crore Rolling Stock Contract from Indian Railways
Metro Rail Transit Line (MRT-7): A New Way Forward for the North
Delhi Metro inaugurates New State-of-the-Art Museum at Supreme Court Metro Station
Knorr-Bremse unviels plan to invest ₹1,907 Crore in New Rail Manufacturing Facility in Chennai
Landmark-Neev JV bags ₹151.2 crore station finishing contract for Mumbai Metro Line 2B
How Delhi Metro is reimagining urban architecture for a sustainable public transport?
Why India needs a dedicated Ministry for Metro Railways?
How Ashwini Vaishnaw is shaping India's Railways, Digital Future and Manufacturing Rise?
Dev–N.Rose bags ₹201.49-crore Architectural Works contract for 7 stations of Mumbai Metro Line 2B
Bangalore Metro to float tenders for ₹25,311 crore Hosahalli–Kadabagere Metro Line
In the bustling urban landscape of Ahmedabad, India, an ambitious transformation is underway with the development of an extensive metro rail network. With two of metro rail lines spanning a combined length of 68.28 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 16,157.17 cr., this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Ahmedabad Metro project was started on 06 March 2019 and the system is now covering a total of 68.28 km with two lines. By the end of 2025, the Ahmedabad Metro will cover a total network of 68.28 kilometers.
#1 Blue Line: Vastral Gam - Thaltej Gam (21.16 km) Operational
#2 Red Line: Motera stadium - Gift City (47.12 km) Partially Operational
Line 1:Blue (East-West Corridor): Vastral Gam - Thaltej Gam
Line 2: Red (North-South Corridor): Motera Stadium - APMC
Line-2 Red (North-South): Motera Stadium – Mahatma Mandir
Line-2: Red (Branch Line, Eastern Spur): Gujarat National Law University – Gujarat International Finance Tec-City (GNLU – GIFT City)
Phase I - Line 1 (Blue) - Apparel Park (Operational)
Phase I - Line 2 (Red) - Gyaspur (Operational)
Phase II - Line 2 (Red) - Indroda (Under Construction)
Up to 7.5 km - ₹ 10
Above 7.5 and Up to 21 km - ₹ 25
079-22960123
Gujarat Metro Rail Corporation Limited
Corporate Office: 803, 8th Floor, GNFC Info Tower,
Sarkhej, Gandhinagar Highway, Bodakdev,
Ahmedabad – 380054, Gujarat, India
Email: care@gujaratmetrorail.com
Website: www.gujaratmetrorail.com