TBM Servarayan achieves Tunnel Breakthrough on Corridor 3 of Chennai Metro Phase 2
India targets 350 kmph Indigenous Bullet Train to accelerate High-Speed Rail ambitions
RTA invites bids for $9.2 billion Dubai Metro's Gold Line Expansion Project
ICT–RINA JV awarded Design Consultancy Contract for Jaipur Metro Phase 2
J. Kumar Infraprojects achieves TBM Breakthrough at Mahipalpur for Delhi Metro Phase IV
DPR submitted for 671 km Hyderabad–Pune–Mumbai High-Speed Rail Corridor
Former Railway Board Member Anil Kumar Khandelwal Joins Advisory Board of Rail Chamber
Govt proposes 270-km Orbital Rail Corridor to transform Regional connectivity in Delhi-NCR
Tamil Nadu approves ₹9,335 Crore Chennai Airport–Kilambakkam Metro Corridor
NCRTC to appoint General Consultant for Delhi–Panipat–Karnal Namo Bharat RRTS Corridor
In the bustling urban landscape of Ahmedabad, India, an ambitious transformation is underway with the development of an extensive metro rail network. With two of metro rail lines spanning a combined length of 68.28 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 16,157.17 cr., this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Ahmedabad Metro project was started on 06 March 2019 and the system is now covering a total of 68.28 km with two lines. By the end of 2025, the Ahmedabad Metro will cover a total network of 68.28 kilometers.
#1 Blue Line: Vastral Gam - Thaltej Gam (21.16 km) Operational
#2 Red Line: Motera stadium - Gift City (47.12 km) Partially Operational
Line 1:Blue (East-West Corridor): Vastral Gam - Thaltej Gam
Line 2: Red (North-South Corridor): Motera Stadium - APMC
Line-2 Red (North-South): Motera Stadium – Mahatma Mandir
Line-2: Red (Branch Line, Eastern Spur): Gujarat National Law University – Gujarat International Finance Tec-City (GNLU – GIFT City)
Phase I - Line 1 (Blue) - Apparel Park (Operational)
Phase I - Line 2 (Red) - Gyaspur (Operational)
Phase II - Line 2 (Red) - Indroda (Under Construction)
Up to 7.5 km - ₹ 10
Above 7.5 and Up to 21 km - ₹ 25
079-22960123
Gujarat Metro Rail Corporation Limited
Corporate Office: 803, 8th Floor, GNFC Info Tower,
Sarkhej, Gandhinagar Highway, Bodakdev,
Ahmedabad – 380054, Gujarat, India
Email: care@gujaratmetrorail.com
Website: www.gujaratmetrorail.com