Alstom pauses New Hydrogen Train Development after French Funding Withdrawal
Kolkata Metro signs India-Nepal Land Exchange MoU for Purple Line
Dilip Buildcon begins construction for Gurugram Metro Expansion Project
Dubai Metro Blue Line reaches 10% completion in just Five Months, Set to hit 30% by late 2026
BMRCL turns to Delhi Metro for Integrated Data Management System to strengthen O&M efficiency
Bids invited for major underground package of Delhi Metro Phase 4’s Inderlok–Indraprastha corridor
New DPR warns Bengaluru’s Phase-3 Double-Decker Metro Corridor may not ease traffic woes
Delhi Metro launches 10-Year Corporate Plan exercise to shape Mobility Vision for 2037
Govt of India approves ₹9,857.85 crore Pune Metro Phase 2 Extension Project
Alstom marks 10 years of MELPL JV with Indian Railways in delivering most powerful E-Locomotives
In the bustling urban landscape of Ahmedabad, India, an ambitious transformation is underway with the development of an extensive metro rail network. With two of metro rail lines spanning a combined length of 68.28 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 16,157.17 cr., this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Ahmedabad Metro project was started on 06 March 2019 and the system is now covering a total of 68.28 km with two lines. By the end of 2025, the Ahmedabad Metro will cover a total network of 68.28 kilometers.
#1 Blue Line: Vastral Gam - Thaltej Gam (21.16 km) Operational
#2 Red Line: Motera stadium - Gift City (47.12 km) Partially Operational
Line 1:Blue (East-West Corridor): Vastral Gam - Thaltej Gam
Line 2: Red (North-South Corridor): Motera Stadium - APMC
Line-2 Red (North-South): Motera Stadium – Mahatma Mandir
Line-2: Red (Branch Line, Eastern Spur): Gujarat National Law University – Gujarat International Finance Tec-City (GNLU – GIFT City)
Phase I - Line 1 (Blue) - Apparel Park (Operational)
Phase I - Line 2 (Red) - Gyaspur (Operational)
Phase II - Line 2 (Red) - Indroda (Under Construction)
Up to 7.5 km - ₹ 10
Above 7.5 and Up to 21 km - ₹ 25
079-22960123
Gujarat Metro Rail Corporation Limited
Corporate Office: 803, 8th Floor, GNFC Info Tower,
Sarkhej, Gandhinagar Highway, Bodakdev,
Ahmedabad – 380054, Gujarat, India
Email: care@gujaratmetrorail.com
Website: www.gujaratmetrorail.com