General Information
Project Summary
- Project Name: Chennai Metro Rail Project
- Owner: Govt. of India and Govt. of Tamilnadu
- Operator: Chennai Metro Rail Limited (CMRL)
- Project Type: Mass Rapid Transit System (MRTS)
- Project Cost: INR 85,613 Crores
- Total Length: 54.1 km
- Funding Pattern: Govt. of Tamilnadu and Foreign Institution
- Completion Target: 2021
- Current Status: Operational since June 29, 2015
Operational Routes
Line 1 (Blue): Washermanpet - Chennai International Airport
- Total Length: 23.10 km
- Total Stations: 17 Stations (All operational)
- Station Names: Washermanpet, Mannadi, High Court, Chennai Central, Government Estate, LIC, Thousand Lights, AG-DMS, Teynampet, Nandanam, Saidapet, Little Mount, Guindy, Alandur, Nanganallur Road, Meenambakkam, Chennai International Airport.
Line 2 (Green): Central - St. Thomas Mount
- Total Length: 22 km
- Total Stations: 17 Stations (All Operational)
- Station Names: Chennai Central, Egmore, Nehru Park, Kilpauk Medical College, Pachaiyappa's College, Shenoy Nagar, Anna Nagar East, Anna Nagar Tower, Thirumangalam, Thirumangalam, CMBT, Arumbakkam, Vadapalani, Ashok Nagar, Ekkattuthangal, Alandur, St. Thomas Mount.
Fares
NA
Contact details
Chennai Metro Rail Limited
Admin Building,CMRL Depot,
Poonamallee High Road,
Koyambedu,Chennai – 600107,
Tamil Nadu,India.
Tel: 44 – 23792000, 1860-425-1515
Email: [email protected]
Website: https://chennaimetrorail.org
Route Map
NA
In-depth Information