Alstom powers Delhi Metro's Pink and Magenta Line with Driverless Trains and CBTC Signalling
South India's 744-km Chennai–Hyderabad Bullet Train Corridor set to transform connectivity
TDC Contracting bags ₹92.10 Crore E&M Systems Contract for Chennai Metro Phase 2 Corridor 3
Bids Invited for 5-Year Rolling Stock Maintenance Contract for Navi Mumbai Metro Line 1
Madhya Pradesh plans to expand Indore Metro to Ujjain, Pithampur and Mhow
Punjab approves 27-km long Pakistan’s first fully underground Lahore Blue Line Metro Project
Tec4 Ingenieros-led JV appointed as Independent Engineer for ₹1,016 Crore BKC Pod Taxi Project
MMRDA to appoint General Consultant for ₹4,063 Crore Mumbai Metro Line 5A Extension
Railway proposes 50-Year Concession Period and Land Acquisition Support to boost PPP Projects
BHEL vs Siemens, ABB and Medha: A Case Study in Technology Ownership and Industrial Strategy
| Line | Routes | Length | Current Status | |||
| #1 Red Line | Miyapur - LB Nagar | 29.21 km | Operational | |||
| #2 Green Line | JBS - Falaknuma | 15.2 km | Operational (11 km) | |||
| #3 Blue Line | Raidurg - Nagole | 29 km | Operational | |||
| #4 Airport Express | Mindspace Junction – Rajiv Gandhi International Airport (RGIA) | 31 km | Approved |
| Phase | Project Cost | Funding By | ||
| Phase 1 | ₹18,800 Crore | Hyderabad Metro Rail Limited, Govt. of Telangana |