Lisha Engineers bags ₹138.70 crore Sanoth Depot Contract for Delhi Metro's Rithala-Kundli Corridor
India commissions 1,506-km dedicated freight railway corridor connecting JNPA to New Dadri
Exclusive Interview with Uwe Sperber, Site Manager, Hubner Interface Systems India
Bangalore Metro floated tender for 13.8-km Phase-3 Double-Decker Rail Infrastructure
AECOM–NIPPON KOEI JV appointed as PMC Consultant for Chennai Metro Phase 1 capacity enhancement
EPC Leader Larsen & Toubro Ltd (L&T) joins Chamber of Railway Industries as Corporate Member
Contractor prequalification deadline for Dubai Metro Gold Line is extended to October 9
Indore Metro Rail Network expands to 17 km as Priority Corridor 2 opened to public
Jaffer PC appointed as Managing Director of Bangalore Metro Rail Corporation (BMRC)
CMRL appoints Systra to prepare Multi-Modal Integration DPR for Chennai Metro Phase 1 stations
In the bustling urban landscape of Hyderabad, India, an ambitious transformation is underway with the development of an extensive metro rail network. With thirteen metro rail lines spanning a combined length of 581.41 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs.87,100 cr. INR, this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Hyderabad Metro project was started on 29 November 2017 and the system is now covering a total of 69.2 km with 3 lines. By the end of 2028, the Hyderabad Metro will cover a total network of 581.41 kilometers.
#1 Red Line: Miyapur - LB Nagar (29.21 km) Operational
#2 Green Line: JBS – Falaknuma (15.2 km ) Operational (11 km)
#3 Blue Line: Raidurg – Nagole (29 km) Operational
#4 Airport Express: Mindspace Junction – Rajiv Gandhi International Airport (RGIA) (31 km) Approved.
Line 1 (Red Line): Miyapur – LB Nagar (via Ameerpet)
Line 2 (Green Line): JBS – Falaknuma (via MG Bus Station)
Line 3 (Blue Line): Raidurg - Nagole
Line 2 (Green Line): MGBS – Falaknuma
Line 3 (Blue Line): Nagole – LB Nagar
Line 4 (Airport Express): Mindspace Junction – Rajiv Gandhi International Airport (RGIA)
Line 5 : Lakdi ka Pul – BHEL
Phase I - Line 1 (Red) - Miyapur (Operational)
Phase I - Line 2 (Green) - Falaknuma (Operational)
Phase I - Line 3 (Blue) - Uppal (Operational)
0 - 2 km - ₹10
2 - 4 km - ₹15
4 - 6 km - ₹25
6 - 8 km - ₹30
8 - 10 km - ₹35
10 - 14 km - ₹40
14 - 18 km - ₹45
18 - 22 km - ₹50
22 - 26 km - ₹55
> 26 km - ₹60
Click here to view Hyderabad Metro Route Map
Key Dates
40 2208 0000-01/40 233 88 587 / 588
L&T Metro Rail (Hyderabad) Limited
Hyderabad Metro Rail Administrative Building
Uppal Main Road,
Nagole, Hyderabad
Telangana- 500039
Email: customerservice@ltmetro.com
Website: www.ltmetro.in
Hyderabad Metro Rail Limited
Rasoolpura, Begumpet
HYDERABAD - 500 016.
Email: NA
Website: hmrl.co.in
Hyderabad Metro Phase 1 | Hyderabad Metro Phase 2