General Information
Project Summary
-
Project Name: Hyderabad Metro Rail Project
- Owner: Hyderabad Metro Rail Limited, Govt. of Telangana
- Operator: L&T Metro Rail (Hyderabad) Limited
- Project Type: Mass Rapid Transit System (MRTS)
- Planned Metro Rail Network: 188 km (7 Lines)
- Operational Network: 69.2 km
- Project Cost: INR 18,800 Crore (Phase-I)
- Funding Pattern: PPP Mode
- Start Date of Operation: 29 November 2017
Project Details
Line |
|
Routes |
|
Length |
|
Current Status |
|
#1 Red Line |
|
Miyapur - LB Nagar |
|
29.21 km |
|
Operational |
|
#2 Green Line |
|
JBS - Falaknuma |
|
15.2 km |
|
Operational (11 km) |
#3 Blue Line |
|
Raidurg - Nagole |
|
29 km |
|
Operational |
Operational Routes
Line 1 (Red Line): Miyapur – LB Nagar (via Ameerpet)
- Route length: 29.21 km (Operational)
- Total Stations: 27 (All elevated)
- Stations: Miyapur, JNTU College, KPHB Colony, Kukatpally, Balanagar, Moosapet, Bharat Nagar, Erragadda, ESI Hospital, SR Nagar, Ameerpet, Punjagutta, Irrum Manzil, Khairatabad, Lakdikapul, Assembly, Nampally, Gandhi Bhavan, Osmania Medical College, Mahatma Gandhi Bus Station (MGBS), Malakpet, New Market, Musarambagh, Dilsukhnagar, Chaitanyapuri, Victoria Memorial, LB Nagar.
- Interchange Stations: Ameerpet (Blue Line), MGBS (Green Line)
Line 2 (Green Line): JBS – Falaknuma (via MG Bus Station)
- Route length: 10.5 km (Operational-11 km, Under construction-4.2 km)
- Total Stations: 10 (All elevated)
- Operational Stations: JBS, Parade Grounds, Secunderabad, Gandhi Hospital, Musheerabad, RTC Cross Roads, Chikkadpally, Narayanguda, Sultan Bazar, Mahatma Gandhi Bus Station (MGBS).
- Interchange Stations: MGBS (Red Line), Parade Grounds (Blue Line)
Line 3 (Blue Line): Raidurg - Nagole
- Route Lenth: 27 km (Operational)
- Total Stations: 23 (All elevated)
- Stations: Nagole, Uppal, Survey of India, NGRI, Habsiguda, Tarnaka, Mettuguda, Secunderabad, Parade Grounds, Paradise, Rasool Pura, Prakash Nagar, Begumpet, Ameerpet, Madhura Nagar, Yusuf Guda, Road No 5 Jubilee Hills, Jubilee Hills Check Post, Pedamma Temple, Madhapur, Durgam Chervu, HITEC City, Raidurg.
- Interchange Stations: Ameerpet (Red Line), Parade Grounds (Green Line)
Train Maintanance Depot
Phase |
|
Line |
|
Location |
Phase I |
|
Line 1 (Red) |
|
Miyapur (Operational) |
Phase I |
|
Line 2 (Green) |
|
Falaknuma (Operational) |
Phase I |
|
Line 3 (Blue) |
|
Uppal (Operational) |
Fares
Slab | Distance (km) | Metro Fare (₹) |
1 |
0 - 2 km |
₹10 |
2 |
2 - 4 km |
₹15 |
3 |
4 - 6 km |
₹25 |
4 |
6 - 8 km |
₹30 |
5 |
8 - 10 km |
₹35 |
6 |
10 - 14 km |
₹40 |
7 |
14 - 18 km |
₹45 |
8 |
18 - 22 km |
₹50 |
9 |
22 - 26 km |
₹55 |
10 |
> 26 km |
₹60 |
Route Map
Key Dates
- August 2003: The project was approved by Govt of India.(Phase I)
- 28 November 2017: Inaugurated by the Prime Minister Narendra Modi.
- 29 November 2017: 16.8 km section (Nagole – Ameerpet) of Line 3 (Blue) open for public.
- 29 November 2017: 11.3 km section (Ameerpet - Miyapur) of Line 1 (Red) open for public.
- 24 September 2018: 16.8 km section (Ameerpet - LB Nagar) of Line 1 (Red) open for public.
- 7 February 2020: 11 km section (JBS - MGBS) of Line 2 (Green) open for public.
- 20 March 2019: 8.5 km section (Hitech City - Ameerpet) of Line 3 (Blue) open for public.
- 29 November 2019: 1.5 km section (Raidurg - Hitech City) of Line 3 (Blue) open for public.
In-depth Information
Metro Authority Contact details
L&T Metro Rail (Hyderabad) Limited
Hyderabad Metro Rail Administrative Building
Uppal Main Road,
Nagole, Hyderabad
Telangana- 500039
Tel: 40 2208 0000-01
Email: customerservice@ltmetro.com
Website: www.ltmetro.in
Hyderabad Metro Rail Limited
Rasoolpura, Begumpet
HYDERABAD - 500 016.
Tel: 40 233 88 587 / 588
Email: NA
Website: hmrl.co.in