Jaipur Metro: Project Information, Routes, Fares and other Details

Sangeeta Singh Posted on: 2022-01-25 12:36:00 Viewer: 1,130 Comments: 0 Country: India City: Jaipur

Jaipur Metro: Project Information, Routes, Fares and other Details

The rapid industrialization and commercial development of Jaipur, teamed with a growing population, the transport infrastructure of the city was found to be overburdened. As a result, the government mulled over establishment of Jaipur Metro on the lines of Delhi Metro which had proved to be a great success.

Project Summary

  • Project Name: Jaipur Metro Rail Project
  • Operator: Jaipur Metro Rail Corporation Limited (JMRC)
  • Owner: Govt. of Rajasthan
  • General Consultant: Delhi Metro Rail Corporation (DMRC)
  • Project Type: Mass Rapid Transit System (MRTS)
  • Project Cost: INR 7695.00 Crore
  • Start Date of Operation: 3 June 2015

Project Details

Line            Routes   Length   Current Status  
1   Mansarovar - Badi Chaupar   12.0 km   Operational   

Operational Routes

Phase I: Mansarovar - Badi Chaupar (North-South Corridor)

  • Route Length: 12.0 km
  • Project Cost: INR 3,149 crore
  • Stations: 11 Stations
  • No. of Trains: 10
  • Operational Stations: Mansarovar, New Aatish Market, Vivek Vihar, Shyam Nagar, Ram Nagar, Civil Lines, Railway Station, Sindhi Camp, Chand Pole, Chhoti Chaupar, Badi Chaupar.
  • Depot: Mansarovar

Fares

Distance   Fare
0 to 2 Stations   ₹10
3 to 5 Station   ₹15
6 to 8 station   ₹20

Route Map

NA

Project Information

Phase II: India Gate - Ambabari (East-West Corridor)

  • Route Length: 23.5 km
  • Stations: 21 Stations
  • Project Cost: Rs.4,546.00
  • Proposed Stations: India Gate, Kumbha Marg, Haldi Ghati Gate, Pinjarapole Gausala, Sanganer Sethu, B2 Bypass, Durgapura, Mahaveer Nagar, Dev Nagar, Gandhi Nagar Railway Station, Tonk Phatak, Ram Bagh Circle, Narayan Singh Circle, SMS Hospital, Ashok Marg, Government Hostel, Chandpole, Collectorate, Subhas Nagar, Pani Pech and Ambabari.

Project Cost & Funding:

Phase   Project Cost    Funding By
Phase 1   7695.00 Crore   Jaipur Metro Rail Corporation Limited (JMRC)

 Deadline: NA

Technical Information

  • Design Speed:80 kmph
  • Average Speed: 32 kmph
  • Track Gauge: Standard Gauge – 1435 mm
  • Electrification: 25 kV, OHE
  • Signalling System: Communications-based Train Control (CBTC)
  • Rolling stock: BEML Limited

Major Contracts

Package   Contractors   Work Description
GC   Mott MacDonald   General Consultancy Services
RS8   BEML Ltd.    40 Coaches (Rolling Stock)
E1/E2   Alstom India   Signalling & Telecommunications
TVS   Samsung SDS   Automatic Fare Collection (AFC)
C1   DSC Limited   6.472 km viaduct
C2 & C3   ITD-ITD CEM JV   4.5 km viaduct & Chandpol underground station
C4   Pratibha-Aparna JV   Mansarovar Depot
C5 & C6   BL Kashyap & Sons   4 Stations at Mansarovar, New Aatish Market, Vivek Vihar & Shyam Nagar & 2 Stations at Ram Nagar & Civil Lines
C7   KMV Projects – RVR Projects JV   2 Stations at Railway Station & Sindhi Camp
1B/C1   CEC-CICI JV   2.35 km underground twin tunnels & 2 stations at Choti Chaupar & Badi Chaupar
PH2   JJ Engineers   Topographical Survey for preparation of 48 km Phase 2’s Detailed Project Report and extn of Phase 1B to Ramganj
PH2   ICRA Management Consulting Services Ltd.   Traffic and Transportation Study

Progress So Far

  • 03 June 2015: 9.63 km section between Mansarovar – Chandpole on Pink Line opened
  • 23 September 2020: 2.35 km section between Chandpole – Badi Chaupar on Pink Line opened 

Metro Authority Contact Detail

Jaipur Metro Rail Corporation Limited 

Admin Building, Metro Depot,

Bhrigu Path, Mansarovar, Jaipur-302020  

Tel: 0141-2822756

Email: [email protected], [email protected]

Website: transport.rajasthan.gov.in

 

 

  




Also Read




Leave Your Comment!









Recent Comments!

No comments found...!