In the bustling urban landscape of Kochi, India, an ambitious transformation is underway with the development of an extensive metro rail network. With two metro rail lines spanning a combined length of 39.7 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 7,758 cr. INR, this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Kochi Metro project was started on 19 June 2017 and the system is now covering a total of 25.6 km with 1 lines. By the end of 2025 , the Kochi Metro will cover a total network of 39.7 kilometers.
Project Summary
- Project Name: Kochi Metro Rail Project
- Operator: Kochi Metro Rail Limited (KMRL)
- Owner: Govt. of India and Govt. of Kerala
- Project Type: Mass Rapid Transit System (MRTS)
- Project Cost: INR 7,758.79 Crores
- Funding Agency: JICA, AFD
- Status: Operational -17 June 2017
Routes & Network
#1 Line: Aluva - SN Junction (28.8 km) Operational (28.8)
#2 Line: Jawahar Lal Nehru Stadium - Info Park (11.2 km) Approved
Operational Routes
Phase I: Aluva - Petta - SN Junction
- Route Length: 28.8 km
- Stations: 21 Stations
- No. of Trains: 25
- Operational Stations: Aluva, Pulinchodu, Companypady, Ambattukavu, Muttom, Kalamassery, Cochin University, Pathadipalam, Edapally, Changampuzha Park, Palarivattom, JLN Stadium, Kaloor, Lissie, M.G Road, Maharaja’s College, Ernakulam South, Kadavanthra, Elamkulam, Vytila, Thykkoodam, Petta, Vadakkekotta, SN Junction and Tripunithura Terminal.
Depot: Muttom
Future Expansion
Jawahar Lal Nehru Stadium - Info Park
- Route Length: 11.2 km
- Stations: 11 Stations
- Project Cost: Rs.2,577.00
- Proposed Stations: Palarivattom Junction, Palarivattom Signal, Chembumukku, Vazhakkala, Kunnumpuram, Kakkanad Junction, Kochi Special Economic Zone, Chittethukara, Rajagiri, Info Park I, Info Park II.
Airport extension: Aluva - Angamaly
Train Maintenance Depot
Phase I - Line 1 (Blue) - Muttom (Operational)
Fares
Upto 2 Km - ₹10
2 Km to 5 Km - ₹20
5 Km to 10 Km - ₹30
10 Km to 15 Km - ₹40
15 km to 20 Km - ₹50
20 Km to 25 Km - ₹60
Route Map
Click to view on Google Maps
Key Dates
- 13 September 2012: Foundation stone laid down by Prime Minister Narendra Modi.
- June 2013: Construction work was started.
- 17 June 2017: Aluva – Palarivattom (Line 1/Phase 1) 13.26 km.
- 03 October 2017: Palarivattom – Maharaja’s College (Line 1/Phase 1) 4.96 km.
- 03 September 2019: Maharaja’s College – Thaikoodam (Line 1/Phase 1) 5.56 km.
- 07 September 2020: Thaikoodam – Petta (Line 1/Phase 1) 1.13 km.
- 01 September 2022: Petta – S.N. Junction (Line 1/Phase 1 A) 1.8 km.
- 6 March 2024: S.N. Junction – Tripunithura (Line-1/Blue Line) – 1.16 km
Helpline No.
18004250355, 0484-2846700/70
Operator
Kochi Metro Rail Limited
JLN Metro Station, 4th Floor,
Kaloor, Ernakulam, Kerala 682017
Email: contact@kmrl.co.in
Website: kochimetro.org
In-depth Information
Phase 1