Visakhapatnam Metro is a planned rapid transit system for the city of Visakhapatnam in Andhra Pradesh India. The system is proposed to reduce traffic congestion as well as providing a modern and efficient public transport system in the city which became the largest city and the main hub for economic activity of Andhra Pradesh after the state's bifurcation.It will be the only Indian city which will have a combination of both metro and tram. Once constructed it will be the world's largest metro prepared in a PPP model.
Project Summary
- Project Name: Visakhapatnam Light Metro Rail Project
- Type of System: Light Rail Transit System (LRTS)
- Executing Body: Andhra Pradesh Metro Rail Corporation
- Owner: Govt. of India and Govt. of Andhra Pradesh
- Project Cost: INR 15,933 Crore
- Total Network: 140.2 km
- Completion Target: 2025
- Status: Under consideration
Operational Routes
NA
Fares
Not yet decided as project in now under construction.
Route Map
NA
Project Information
Line 1: Steel Plant - Kommadi
- Route Length: 34.23 km
- Stations: 20
- Station Names: Steel Plant <unknown> Kommadi Junction, Hanumanthawaka Junction, Maddilapalem, Gurudwara Junction, Akkayyapalem, Kancharapalem, Muralinagar, Government Polytechnic College, Thatichetlapalem, Kancharapalem, Murali Nagar, GSI, NAD Junction, Visakhapatnam International Airport, Sheela Nagar, BHPV, Auto Nagar and Gajuwaka.
Line 2: Gurudwara - Old Post Office
- Route Length: 5.26 km
- Stations: 6
- Station Names: BVK College, RTC Complex, Dabagardens, Saraswati Circle, Poorna Market and Old Post Office.
Line 3: Thatichetlapalem - RK Beach
- Route Length: 6.91 km
- Stations: 7
- Station Names: New Railway Colony, Railway Station, Allipuram Junction, RTC Complex, Siripuram Junction, Andhra University and Chinna Waltair.
Line 4: Law College - Marikivalasa
- Route Length: 8.21 km
- Stations: TBD
- Station Names: TBD
Line 5: Anandpuram Junction - Bhogapuram Airport
- Route Length: 17.0 km
- Stations: TBD
- Station Names: TBD
Line 1 (Extension): Kommadi - Anandpuram Junction
- Route Length: 8.3 km
- Stations: TBD
- Station Names: TBD
Visakhapatnam Tram Project
Total Network: 60.2 km | Project Period: 2023-2029
- Line 1: NAD Junction - Pendurtin (10.2 km)
- Line 2: Steel Plant - Anakapalli (18.20 km)
- Line 3: Old Post Office - Rusikonda (15.40 km)
- Line 3 (Extn): Rusikonda - Bheemili Beach (16.40 km)
Project Cost & Funding:
Phase |
|
Project Cost |
|
Funding By |
|
|
₹15,933 crore |
|
Govt. of India and Govt. of Andhra Pradesh |
Deadline: NA
Technical Information
- Design Speed: NA
- Average Speed: NA
- Track Gauge: Standard Gauge – 1435 mm
- Electrification: 25kV, 50Hz (OHE/OCS)
- Signalling System: CBTC
- Rolling stock: NA
Major Contractors
- Urban Mass Transit Company (UMTC): Feasibility Study and DPR Consultancy
Progress So Far
NA