Lisha Engineers bags ₹138.70 crore Sanoth Depot Contract for Delhi Metro's Rithala-Kundli Corridor
India commissions 1,506-km dedicated freight railway corridor connecting JNPA to New Dadri
Exclusive Interview with Uwe Sperber, Site Manager, Hubner Interface Systems India
Bangalore Metro floated tender for 13.8-km Phase-3 Double-Decker Rail Infrastructure
AECOM–NIPPON KOEI JV appointed as PMC Consultant for Chennai Metro Phase 1 capacity enhancement
EPC Leader Larsen & Toubro Ltd (L&T) joins Chamber of Railway Industries as Corporate Member
Contractor prequalification deadline for Dubai Metro Gold Line is extended to October 9
Indore Metro Rail Network expands to 17 km as Priority Corridor 2 opened to public
Jaffer PC appointed as Managing Director of Bangalore Metro Rail Corporation (BMRC)
CMRL appoints Systra to prepare Multi-Modal Integration DPR for Chennai Metro Phase 1 stations
In 2017,The Tamil Nadu Government proposed a metro for the city of Coimbatore.The Systra group was involved to do the feasibility and finalize the routes in the proposed metro rail.The CMRL proposed five corridors in Coimbatore Metro.The Government of Tamil Nadu under ADMK proposed a metro rail system for Coimbatore. Coimbatore Railway Struggle Committee has also protested to implement metro rail project in Coimbatore. In 2013, E. Sreedharan made survey and announced metro rail as suitable transport for Coimbatore.
Cooridore 1: PSG Foundry - Vellalore Bus Terminal
Cooridore 2: Valiyampalayam Pirivu - Collectorate Metro
Not yet decided as project in now under construction.
| Phase | Project Cost | Funding By | ||
| NA | Govt. of India and Govt. of Tamilnadu |
NA