Lucknow Metro: Project Information, Routes, Fares and other Details

Sangeeta Singh Posted on: 2022-01-25 12:36:00 Viewer: 4,032 Comments: 0 Country: India City: Lucknow

Lucknow Metro: Project Information, Routes, Fares and other Details

In the bustling urban landscape of Lucknow, India, an ambitious transformation is underway with the development of an extensive metro rail network. With two metro rail lines spanning a combined length of 33.9 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 11,962.55 INR, this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Lucknow Metro project was started on 06 September 2017  and the system is now covering a total of 22.9 km with 1 lines. By the end of 2025, the Lucknow Metro will cover a total network of 33.9 kilometers.

Project Summary

  • Project Name: Lucknow Metro Rail Project
  • Operator: Uttar Pradesh Metro Rail Corporation Limited (UMRCL)
  • Owner: Govt. of India and Govt. of Uttar Pradesh
  • Project Type: Mass Rapid Transit System (MRTS)
  • Project Cost: INR 11,962.55 Crores (Phase-I)
  • Funding: Govt. of India, Govt. of Uttar Pradesh and European Investment Bank (EIB)
  • Completion Target: 2027 (Phase-I)
  • Status: Operational since Sept 5, 2017.

Project Details

#1 Red Line: CCS Airport - Munshi Pulia (22.9 km) Operational 

#2 Blue Line: Charbagh Railway Station - Vasant Kunj (11.0 km) DPR submitted

Operational Routes

(Phase-I) North-South Corridor 1 (Red Line): CCS Airport - Munshi Pulia

  • Route Length: 22.87 km
  • Project Cost:  Rs 6,928 crores
  • Total Stations: 21 (Elevated - 17, Underground - 4)
  • Station Names: Chowdhary Charan Singh Airport, Amausi, Transport Nagar, Krishna Nagar, Singar Nagar, Alambagh, Alambagh ISBT, Mawaiya, Durgapuri, Charbagh Railway Station, Hussaingunj, Sachivalaya, Hazratgunj, KD Singh Babu Stadium, Lucknow Vishwavidyalaya, IT College, Badshah Nagar, Lekhraj Market, Bhootnath Market, Indra Nagar and Munshi Pulia.

Train Maintanance Depot

Phase I - Line 1 (Red) - Transport Nagar (Operational)

Fares 

for 1 Station - 10

for 2 Station - 15

from 3 to 6 Station - 20

from 7 to 9 Station - 30

from 10 to 13 Station - 40

from 14 to 17 Station - 50

For 18 Stations or Above - 60

Route Map

Click to view on Google Maps

Project Information (Proposed)

East-West Corridor 2 (Blue Line): Lucknow Railway Station - Vasant Kunj

  • Route Length: 11.098 km
  • Project Cost: Rs 5,034.55 crore
  • Total Stations: 12 Stations (Elevated - 5, Underground - 7)
  • Stations Name: Charbagh (U/G), Gautam Budh Nagar (U/G), Aminabad (U/G), Pandeyganj (U/G), City Railway Station (U/G), Medical Chauraha (U/G), Nawazganj (U/G), Thakurganj, Balaganj, Sarfarazganj, Musabagh and Vasant Kunj.

Phase-II

  • Line 3: IIM Lucknow to Rajajipuram
  • Line 4: Indira Nagar to CG City
  • Line 5: CG City to CCS International Airport

Phase-III

  • Line 6: Munshipulia to Jankipuram
  • Line 7: Charbagh to SGPGI
  • Line 8: Sachivalaya to CG City

Project Cost & Funding

Phase 1 - ₹11,932.55 - Govt. of India and Govt. of Uttar Pradesh

Deadline: NA

Technical Information

  • Design Speed:90 kmph
  • Average speed: 32–34 kmph
  • Track Gauge: 1,435 mm Standard gauge
  • Electrification: 25 kV Overhead
  • Signalling System: Communications-based Train Control (CBTC)
  • Rolling stock: NA

Major Contracts (Phase-I)

  • Ayesa-KRNA-Aarvee-Geodata (LKGC-01): General Consultancy Services  
  • Systra Consulting (LKDD-01): Detailed Design Consultant  
  • Alstom India (LKRS-01): 80 Coaches (Rolling Stock) & Signalling System  
  • Datamatics & Mikroelektronika (LKS-01): Automatic Fare Collection System  
  • Larsen & Toubro (LKS-02, LKCC-01 & LKCC-07): Telecommunications, Transport Nagar – Charbagh
    (Elevated: 8.48 km + 1 km extn to Amausi & KD Singh Babu – Munshipulia (Elevated – 8.63 km)
  • Kalindee (LKT-05): Ballastless Tracks  
  • SP Singla (LKCC-02): Mawaiya Bridge over IR lines  
  • Sam India Builtwell (LKCC-03 & LKCC-05): Transport Nagar Depot & Amausi – CCS Airport  (Elevated & Underground – 2 km)
  • Tata – Gülermak (LKCC-06): Charbagh – KD Singh Babu (Underground – 3.44 km)
  • Larsen & Toubro (LKCC-07): KD Singh Babu – Munshipulia (Elevated – 8.63 km)
  • Sam India Builtwell (LKCC-05): Amausi – CCS Airport (Elevated & Underground – 2 km)

Key Dates

  • August 2013: The project was approved by State Govt.(Phase I).
  • December 2013: The project was approved by Govt of India.(Phase I).
  • 27 March 2014: Foundation stone laid for Lucknow Metro project.
  • 27 Sep.2014: Construction work was started.
  • 5 September 2017: Transport Nagar – Carbagh (Line 1/Phase 1) 8.5 km.
  • 8 March 2019: CCS International Airport - Transport Nagar (Line 1/Phase 1) 2.67 km.
  • 8 March 2019: Charbagh - Munshi Pulia (Line 1/Phase 1) 11.73km.

Metro Authority Contact details

Uttar Pradesh Metro Rail Corporation Limited

Administrative Building, Vipin Khand,

Gomti Nagar, Lucknow-226010 (UP)

Tel: 0522-2288869, 0522-2304014

Email: feedback@lmrcl.com

Website: lmrcl.com

  