L&T awarded ₹1,234 Crore Civil Contract for Noida Metro Aqua Line Extension Project
Alstom signs €460 million contract to supply additional Driverless Trains for Riyadh Metro
First Tunnel Boring Machine arrives to construct Pune Metro's Swargate–Katraj Extension Line
Alstom commences manufacturing of Rolling Stock Trains for Chennai Metro corridors 3 and 5
The Not-So-Far South: Metro Manila LRT-1 Cavite Extension Timeline
Bangladesh signs four major contracts for Depot and Civil Works on Dhaka Metro Lines 1 and 5
SYSTRA MVA wins DPR Contract for Chennai Metro's Kilambakkam–Chengalpattu Corridor
BBG Infrastructure wins ₹137.93 crore civil contract for Delhi Metro Phase 4 Project
PM Narendra Modi inaugurates Pune Metro Line 3, Launches Phase-II Projects worth ₹13,500 Crore
Parsons-Led JV selected Project Management Consultant for Riyadh Metro Red Line Extension
In the bustling urban landscape of Pune, India, an ambitious transformation is underway with the development of an extensive metro rail network. With four metro rail lines spanning a combined length of 130.97 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 24,773 cr. INR, this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Pune Metro project was started on 06 March 2022 and the system is now covering a total of 23.8 km with two lines. By the end of 2029, the Pune Metro will cover a total network of 130.97 kilometers.
#1Purple Line: Chinchwad – Katraj (27.48 km) Operational (16. 58km), Under Construction (10.58 km)
#2Aqua Line: Vanaz – Ramwadi (15.35 km) Operational
#Line 3: Hinjawadi- Shivajinagar (23.33 km) Under Construction
Operational: 23.8 km | PCMC - Civil Court (16.58 km, 10 Stations)
Line 1: PCMC - Fugewadi - Civil Court
Line 2: Vanaz - Garware College - Ruby Hall Clinic - Ramwadi
Line 1: Chinchwad - PCMC - Swargate - Katraj
Line 3: Hinjawadi - Shivajinagar
Line-3 Extn: Shivaji Nagar – Kadam Wakwasti (18 km)
Line 4: Swargate – Pul Gate (3 km)
Phase I - Line 1 - Range Hills (Operational)
Phase I - Line 2 - Vanaz (Operational)
Phase I - Line 3 - Maan Village (Under Construction)
0-2km - ₹10
2-4km - ₹20
4-12km - ₹30
12-18km - ₹40
>18km - ₹50
NA
Maharashtra Metro Rail Corporation Limited
METRO BHAVAN, VIP road,
Near Dikshabhoomi,
Nagpur - 440010,
Tel: 07122554217
Email: contactus@mahametro.org
Website: www.mahametro.org