Nagpur, India (Metro Rail Today): Maharashtra Metro Rail Corporation Limited (Maha Metro) has invited global bids from the experienced and eligible construction firms for the contsruction of elevated stretch of Nagpur Metro Rail Project Phase 2.
The scope of work includes construction of (a) Six Elevated Metro Stations Viz. Pili Nadi To Lekha Nagar in Reach- 2A, (B) One Elevated and One At-Grade Station Viz. Ecopark and Metro City in Reach-1A respectively (C) At-Grade Section Formation Earthwork, Boundary Wall and Retaining Wall between CH. 19550 To CH 20421.016 & CH 20498.516 to CH. 21296.917, (D) Elevated Metro Track Supporting Structure for Ecopark Metro Station between CH. 20421.016 to CH 20498.516 and (E) Multi-Storied Building at Tulsi School Land (at Sitabuldi) of Nagpur Metro Rail Project (Phase-2).
The estimated cost of work is Rs 282 crore and the completion is expected in 30 months.
Tender documents can be downloaded from 24th March 2023 to 3rd May 2023 online after payment of Non-refundable cost of tender documents/tender fee of Rs 88,500/-.
A pre-bid meeting will be conducted on 11th April 2023 at 11.00 AM. The last date for submission of bids is 3rd May 2023 till 04.00 PM. Technical bids will be opened on the same day at 04.30 PM.
The 43.8 km Phase-II of Nagpur Metro Rail Project will extend to Kanhan in North, Butibori MIDC in South, Transport Nagar (Kapsi) in East and Hingna in West. The Phase 2 comprises 1.2 km at-grade with 2 stations and 42.6 km elevated with 30 stations. It will connect the satellite cities like Transport Hub at Kapsi, Industrial areas of Hingna and Butibori and Mining areas at Kanhan and it will have only one interchange station at Sitabuldi.
Nagpur Metro Rail Project Phase-II is scheduled to be completed in 2026. It consists of 4 extensions of 2 existing corridors of Phase I, totaling 43.8 km -
For more details, please explore the Indore Metro page of Metro Rail Today.