In the bustling urban landscape of Indore, India, an ambitious transformation is underway with the development of an extensive metro rail network. With four metro rail lines spanning a combined length of 108.53 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 7,500 cr. INR, this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. Construction on the first phase of Indore Metro was started on 6 January 2019 and commissioning of same is expected by March 2024. By the end of 2028, the Indore Metro will cover a total network of 108.53 kilometers.
Project Summary
- Project Name: Indore Metro Rail Project
- Owner: Madhya Pradesh Metro Rail Corporation Limited, Govt. of Madhya Pradesh
- Project Type: Mass Rapid Transit System (MRTS)
- Project Cost: INR 7500.80 Crore
- Funding Pattern: Govt. of India, Govt. of Madhya Pradesh and Loan from Foreign Institutions
- Completion Target: 2024
- Status: Under construction
Routes & Network
Line |
|
Routes |
|
Length |
|
Current Status |
|
Read More |
#3 Yellow |
|
Bhawarsala Square - Super Corridor 1 |
|
33.53 km |
|
U/C |
|
Phase 1 |
#1A |
|
Sri Aurobindo Hospital - Indore Bypass 1 |
|
18 station |
|
Proposed |
|
Phase 2 |
#1B |
|
Sri Aurobindo Hospital - Regional park |
|
13 station |
|
Proposed |
|
Phase 2 |
#2 |
|
Dewas Naka - MHOW |
|
28 station |
|
Proposed |
|
Phase 2 |
#4 |
|
MR 9 - Indore Bypass 4 |
|
16 station |
|
proposed |
|
Phsae 2 |
Under Construction Routes
Line 3 (Ring Line): Palasia – Railway Station – Airport – Palasia
- Route Length: 33.53 km (Underground & Eleveted)
- Total Stations: 30
- Station Names: Bhawarsala Square, MR 10 Road, ISBT / MR 10 Flyover, Chandragupta Square, Hira Nagar, Bapat Square, Meghdoot Garden, Vijay Nagar Square, Radisson Square, Mumtaj Beg Colony, Bengali Square, Patrakar Colony, Palasia Square, High Court / Hotel Residency, Indore Railway Station, Rajwada Palace, Maulana Azad Marg, Bada Ganpati, Ramchandra Nagar Square, Kalani Nagar, BSF, Airport, Gandhi Nagar Nanod, Super Corridor 6, Super Corridor 5, Super Corridor 4, Super Corridor 3, Super Corridor 2 and Super Corridor 1.
- Status: Under Construction
Future Expansion
Line 1A: Sri Aurobindo Hospital – Collectorate office – Indore Bypass 1
- Number of Stations: 18
- Station Names: Sri Aurobindo Hospital, Bhawarsala Square, Sanwer Industrial Area, Ganesh Sham Colony, Banganga, Laxmibai Nagar Square, Mara Mata Square, Imli Bazar Chowk, Rajwada Palace, Collectorate Office, Indore Icchapur Rail Crossing, Tower Square, Bhawarkuan Square, Holkar University/IT Park, Rani Bagh, Limbodi, Ralamandal and Indore Bypass 1.
Line 1B: Sri Aurobindo Hospital – Collectorate office – Regional Park
- Number of Stations: 13
- Station Names: Sri Aurobindo Hospital, Bhawarsala Square, Sanwer Industrial Area, Ganesh Sham Colony, Banganga, Laxmibai Nagar Square, Mara Mata Square, Imli Bazar Chowk, Rajwada Palace, Collectorate Office, Central Excise, Choithram and Regional Park.
Line 2: Dewas Naka – Juni Indore – MHOW
- Number of Stations: 28
- Station Names: Dewas Naka, Niranjanpur Circle, Aranya Nagar, IDA Park, Vijay Nagar Square, Bhamori, Patni Pura/St Joseph Church, Malwa Mill Square, Raj Kumar Bridge, Indore Railway Station, Juni Indore, Collectorate Office, Mhow Naka, Dusshera Maidan, Annapuran Temple, Narmada Public School (Ring Road), Rajendra Nagar, Reti Mandi, IPS Academy, Shramik Colony, Indore Bypass-2, Pigdambar, Umariya, Maa Vaishanodevi Hospital, Haranyakheri / IIT Indore, Chinar Residency and MHOW.
Line 4: MR9 – Indore Railway Station – Indore Bypass 4
- Number of Stations: 16
- Station Names: MR9, Convention Center, Lahiya Colony, Chandragupta Square, Sukliya, Nanda Nagar Main Road, Mazdoor Maidan, Rajkumar Bridge, Indore Railway Station, Chhavani, Sri Agrasen Maharaj Chowk, Navlakha Bus Station, Teen Imli, Babul Nagar, Musakhedi and Indore Bypass 4.
Train Maintanance Depot
Phase |
|
Line |
|
Location |
Phase I |
|
Line 3 (Yellow) |
|
Super Corridor (Under Construction) |
Fares
Not yet decided as project in now under construction.
Route Map
Click to view on Google Maps
Key Dates
- Oct 2018: The project was approved by Govt of India.(Phase I)
- Dec 2021: Foundation stone for construction of 11 km viaduct of Phase I.
- January 2019: Construction work started of Indore Metro Phase I.
Helpline No.
0755-2475603
Operator
Madhya Pradesh Metro Rail Co. Limited
2nd Floor, Zone-14,
Bhopal Municipal Corporation,
BHEL, Govindpura,
Near Natraj Petrol Pump,
Bhopal-462023,
Madhya Pradesh
Email: metrorail@mpurban.gov.in
Website: https://www.mpmetrorail.com/
Phase wise in-depth information
Phase 1 |