Navi Mumbai is a planned city that is adjacent to Mumbai, located in the Konkan division of Maharashtra state, on the mainland of India. Navi Mumbai is situated across two districts, Thane and Raigad, and is part of the Mumbai Metropolitan Region.
Project Summary
- Project Name: Navi Mumbai 'Metro Neo' Project
- Operator: City and Industrial Development Corporation of Maharashtra
- Owner: Govt. of India, Govt. of Maharashtra & CIDCO
- Project Type: Light Rail Transit System (LRTS)
- Total Network: 15.1 km
- No. of Phases: 1 (3 Lines)
- Project Cost: INR 2,000 Crore
- Completion Target: 2026
Operational Routes
NA
Fares
NA
Route Map
NA
MetroNeo Network
Corridor 2: Khandeshwar - MIDC Taloja
- Route Length: 7.12 km
- No. of Stations: 6
- Station Names: Khandeshwar, Sector 10, Sector 2E, Sector 13, Sector 7E, Kasadi, MIDC Station 1 and Taloja MIDC
Corridor 3: MIDC - Pendhar
- Route Length: 3.87 km
- No. of Stations: 3
- Station Names: NA
Corridor 4: Khandeshwar – Navi Mumbai International Airport (NMIA)
- Route Length: 4.17 km
- No. of Stations: 3
- Station Names: NA
Project Cost & Funding:
Phase |
|
Project Cost |
|
Funding By |
Phase-I |
|
₹2000 crore |
|
Govt. of India, Govt. of Maharashtra & CIDCO |
Technical Information
- Design Speed: 65 kmph
- Average Speed: 30 kmph
- Track Gauge: Standard Gauge – 1435 mm
- Electrification: 750VDC
- Signalling System: CBTC
- Rolling Stock: Rubber-tyred Eelectric Coaches with Axle load 10-12Ton
Major Contractors
- Urban Mass Transit Company (UMTC): DPR Consultant
Progress So Far
- April 2023: BoD of CIDCO approved the Navi Mumbai Metro Neo Project.