India's Rail & Metro Year-End Review 2025: A Year of Accelerated Execution and Visible Outcomes
Indian Railways plans to manufacture eight additional sleeper rakes by March 2026
BEML sets timeline for production of high speed trainsets for India's first Bullet Train project
Dr. Vinod Shah appointed First Director General of the Chamber of Railway Industries
Indian Railways to run Namo Bharat Rapid Rail connecting Indore and Ujjain ahead of Simhastha 2028
Jaipur Metro Phase 2 to link Airport Terminals, Promise faster Travel and stronger City connectivity
HMRTC proposes shared RRTS and Metro operations on Gurugram–Faridabad Metro corridor
India launches Chamber of Railway Industries (Rail Chamber) on Good Governance Day
Bangalore Metro network gears up to grow from its current 96 km to 466 km by 2035
South Korea unveils EMU-370, Set to come World’s Second Fastest High-Speed Train
New Delhi, India (Metro Rail Today): The Delhi Metro Rail Corporation Ltd (DMRC) is building longest platform at the Aerocity Metro station to decongest the traffic at the station.
The platform of the new Aerocity Metro station on the Aerocity – Tughlakabad Silver Line corridor of Phase 4 will be the longest among all Phase 4 stations with a length of 289 metres. The general length of underground Metro stations in Phase 4 is about 225 metres.
Its extensive length has been carefully designed to accommodate the anticipated passenger traffic since in the future this station will be a key triple interchange facility with connectivity among the Airport Express Line, the Silver Line, and the RRTS corridor to Gurugram, Manesar and Alwar.
The station will come up at a depth of 23 metres to ensure seamless connectivity between Airport Express Line, the Silver Line, and the RRTS corridor. This station will be a terminal station, which will provide direct connectivity from the NCR City of Faridabad along with South Delhi to West Delhi and especially, the Indira Gandhi International Airport.
The construction work for this station has started and the same is being done by the bottom-up method of construction. There will be three entry/exit points at this station, one connecting the business hub of Aerocity & the other two entry/exit structures will connect the station with NH-8 & the nearby locality of Mahipalpur through a pedestrian subway, thereby improving accessibility to the airport.
One of the key advantages of the Aerocity Station is its provision of interchange with the existing High-Speed Airport Express Line and Delhi-Gurugram-Alwar RRTS Corridor. This seamless integration will enable passengers to effortlessly transfer between the Tughlakabad-Aerocity Corridor and the High-Speed Airport Express Line, providing them with enhanced connectivity options and convenience.
The Tughlakabad -Aerocity Corridor, a significant addition to the city's Metro network, aims to address the increasing transportation demands on Mehrauli-Badarpur Road, Chhattarpur Extension and Mahipal Pur area to cater the growing population of the region. It will serve as a lifeline for commuters, reducing travel time, and offering a reliable and efficient mode of transportation. The station will help the residents of South Delhi, Faridabad and Noida to travel and reach the Airport at a faster speed.