STUP Consultants–Assystem JV wins ₹14.20 crore Design Consultancy for Ahmedabad Metro
Three Global Firms bid for General Consultancy Contract of Lucknow Metro Phase 1B Project
ETA Engg - PISCESIA JV awarded ₹225.87 crore E&M Contract for Delhi Metro Phase 5A Project
Mumbai–Ahmedabad Bullet Train cost rises to ₹2.03 Lakh crore; ₹92,761 crore spent by March 2026
Global Rail & Metro Infrastructure Market to Reach USD 462.13 Billion by 2033
Malaysia awards RM2.69 billion contract for Penang Mutiara Line’s Cross-Sea LRT Extension
Afcons Infrastructure wins ₹876.51 crore contract for Pune Metro Viaduct and Elevated Road Project
SYSTRA–led JV wins ₹228.78 crore Design Consultancy Contract for two 350 kmph Bullet Train Corridors
Paras Railtech wins ₹84.72 crore Ballastless Track Contract for Jaipur Metro Phase 1C Project
SYSTRA India wins DPR Consultancy Contract for Chennai Metro Phase II Corridor 5 Extension
Chennai, India (Metro Rail Today): Chennai Metro Rail Limited (CMRL) has officially handed over the Letter of Acceptance (LoA) for the operation and maintenance (O&M) of its Phase II network to Delhi Metro Rail Corporation Ltd (DMRC) in a significant step forward for the city's urban transport expansion. The contract, valued at ₹5,870 crores, covers a sprawling 118.9 kilometers of metro rail, divided across three major corridors—C3, C4, and C5.
The corridors include:
C3: Madhavaram Milk Colony to Siruseri SIPCOT II Metro
C4: Lighthouse to Poonamallee Bypass
C5: Madhavaram Milk Colony to Sholinganallur
Additionally, the contract encompasses the operation and maintenance of three Maintenance Depots located at Madhavaram, Poonamallee, and Semmancheri.
On April 2, 2025, M.A. Siddique, Managing Director of CMRL, officially handed over the LoA to Dr. Vikas Kumar, Managing Director of DMRC, in a ceremony attended by senior officials from both CMRL and DMRC, including S. Krishnamoorthy, Director (Finance) of CMRL, and Dr. Amit Kumar Jain, Director (Operations & Services) of DMRC.
The scope of work under this agreement is comprehensive, covering all operations and maintenance activities for the Phase II network’s assets, including maintenance at the three depots. DMRC will be responsible for ensuring that all services meet global standards in terms of passenger experience and asset upkeep, aligning with best practices in metro operations and maintenance.
The contract will last for twelve years, starting from the Commercial Operation Date (COD) of the last segment of Phase II, with the potential for a three-year extension based on DMRC’s satisfactory performance. This is second win of DMRC after taking over of O&M contract of Mumbai Metro Line 3 Project.
This major milestone represents another step toward improving Chennai’s metro infrastructure, enhancing connectivity across the city, and delivering modern, efficient services to passengers, all while ensuring high standards of maintenance and operational efficiency.