STUP Consultants–Assystem JV wins ₹14.20 crore Design Consultancy for Ahmedabad Metro
Three Global Firms bid for General Consultancy Contract of Lucknow Metro Phase 1B Project
ETA Engg - PISCESIA JV awarded ₹225.87 crore E&M Contract for Delhi Metro Phase 5A Project
Mumbai–Ahmedabad Bullet Train cost rises to ₹2.03 Lakh crore; ₹92,761 crore spent by March 2026
Global Rail & Metro Infrastructure Market to Reach USD 462.13 Billion by 2033
Malaysia awards RM2.69 billion contract for Penang Mutiara Line’s Cross-Sea LRT Extension
Afcons Infrastructure wins ₹876.51 crore contract for Pune Metro Viaduct and Elevated Road Project
SYSTRA–led JV wins ₹228.78 crore Design Consultancy Contract for two 350 kmph Bullet Train Corridors
Paras Railtech wins ₹84.72 crore Ballastless Track Contract for Jaipur Metro Phase 1C Project
SYSTRA India wins DPR Consultancy Contract for Chennai Metro Phase II Corridor 5 Extension
Ahmedabad, India (Rail & Metro Today): STUP Consultants Private Limited, part of the Assystem Group, has emerged as the H1 bidder for a detailed design consultancy assignment floated by Gujarat Metro Rail Corporation Limited (GMRC) for metro infrastructure in Ahmedabad, Gujarat. The consortium has quoted ₹14.20 crore for the consultancy contract, with the formal award still awaited.
The tender covers detailed design consultancy services for metro viaducts, stations and depots. According to the published tender result, three firms participated in the financial evaluation: STUP Consultants (Assystem), SYSTRA and Aarvee.
The tender is identified by Tender ID 2026_GMRCGMRCL_333750_1.
STUP Consultants secured the H1 position with a quoted amount of ₹14.20 crore. SYSTRA was listed at H2 with a bid of ₹16.71 crore, while Aarvee appeared at H3 with a quotation of ₹14.53 crore.
The estimated project cost is ₹14.53 crore. STUP's quoted amount is approximately 2.3% below the estimate, while SYSTRA's offer is around 15% higher. Aarvee's quoted amount matches the estimated cost.
The result identifies all three firms as admitted bidders, with no technical rejection indicated in the published bid comparison.
The consultancy assignment will cover detailed design services for key components of metro infrastructure, including elevated viaducts, stations and depot facilities.
Detailed design consultancy is an important stage in metro project development, translating project requirements into engineering designs and technical specifications required for subsequent construction. The work involves coordination across civil and structural engineering disciplines to support safe, efficient and reliable infrastructure development.
With STUP Consultants–Assystem emerging as H1, the tender has reached an important evaluation milestone. However, the H1 position should not be treated as a formal contract award. GMRC will need to complete the prescribed approval and procurement formalities before confirming the appointment.
The participation of STUP Consultants, SYSTRA and Aarvee highlights competition among established engineering and infrastructure consultancy firms for specialised metro design assignments in India.