CMRL achieves second Tunnel Breakthrough at Thirumayilai for Chennai Metro Phase 2 Corridor 4
NHSRCL invites Single Tender from BEML for Bullet Train Rolling Stock Package
Railway Minister reviews progress of Ahmedabad–Dholera Semi High-Speed Rail Project
National Planning Group reviews key Rail & Metro projects under PM GatiShakti
CMRS approves Driverless Metro Operations on first stretch of Chennai Metro Phase 2 Corridor 4
J Kumar Infraprojects completes Final Tunnel Breakthrough for Surat Metro Phase 1 Project
Apurvakriti Infrastructure awarded Ballastless Track Contract for Pune Metro Reach-1 Extension
SAM India Builtwell bags first ₹222.76 Crore Civil Contract for Delhi Metro Phase V
HRIDC conducts Investors Pre-Bid Meeting for Haryana Orbital Rail Corridor
NCRTC Chief Shalabh Goel appointed as General Manager of Central Railway
NA
Phase I
Phase II
Phase III
| Phase | Project Cost | Funding By | ||
|
₹ 37000.00 crore
|
Govt. of India and Govt. of Delhi, Uttar Pradesh,Haryana & Rajasthan |
| Phase | Line | Location | ||
| Phase I | Line 1 | Dharuhera & Alwar (Proposed) |
Not yet decided as project in now under construction.
National Capital Region Transport Corporation
GatiShakti Bhawan, INA
New Delhi - 110023
Tel: 011-24666700
Email: contactus@ncrtc.in
Website: https://www.ncrtc.in/
NA
| Package | Contractors | Work Description | |
| 1. | UMTC | Consultant for conducting a feasibility study. | |
| 2. | PricewaterhouseCoopers (PwC) | Financial Consultant on a retainer basis for planning and implementation support for the implementation of RRTS in Delhi-NCR. | |
| 3. | CRRI | Noise and Vibration Consultant. | |
| 4. | CEG Test House and Research Centre Pvt Ltd. | Detailed Geotechnical investigation work for the elevated section from IDPL Complex to Dharuhera & Geotechnical Investigation: Sarai Kale Khan to IDPL Complex in Gurgaon | |
| 5. | GR Infraprojects | Construction of 8.5 km elevated viaduct and three RRTS stations (Rajiv Chowk, Sector 17 Gurugram, Udyog Vihar) in Gurugram Area. (Contract Value - Rs 592.17 crore) | |
| 6. | URS Scott Wilson – CEG JV | Feasibility Study for connecting SNB Urban Complex to Sotanala RIICO Industrial Area | |
| 7. | S S Solution | Final Location Survey, Topographic Survey & Other Misc Surveys | |
| 8. | Shree Balalji Test House Pvt. Ltd. | Geotechnical Investigation for Underground Section: Rajiv Chowk to Kherki Daula | |
| 9. | RITES | Geotechnical Investigation: Dharuhera to SNB | |
| 10. | Continental Piling & Excavation Pvt. Ltd. | Initial Pile Load Test: IDPL Complex in Gurgaon to Dharuhera & Initial Pile Load Test: Dharuhera to SNB | |
| 11.Detailed Design Consultant (DDC) | L&T Infrastructure Engineering Ltd. | Gurgaon section – viaduct from IDPL Ramp to Rajiv Chowk Ramp, and 3 stations | |
| 12.Package 3 | GR Infraprojects(KEC – CCECC JV subcontracted partial works) | Construction of 10 km Gurgaon section: viaduct from IDPL Ramp to Rajiv Chowk Ramp with 3 stations | |
| 13.Detailed Design Consultant (DDC): 7 | SYSTRA – AECOM JV | Stations between Panchgaon – SNB, and Dharuhera Depot | |
| 14. | Detailed Design Consultant for Design of Receiving Sub Stations cum 25 kV AC Traction Substations and 33 kV Auxiliary Main Substations, Extra High Voltage & High Voltage Cabling, 33kV Network & Auxiliary Substations, 25 kV Flexible Overhead Equipment and SCADA System, Operation Control Centre for Complete Corridor |