Modern Trainlines and the End of Coal Trains: Why Rail Networks Have Moved Forward
Siemens Bags Order from Titagarh Rail Systems for Pune Metro Extension Trainsets
Titagarh Rail Systems becomes Corporate Member of Chamber of Railway Industries (Rail Chamber)
World Bank approves ₹1,400 crore Civil Tender for Gurugram Metro Phase 2
Bi-RIDE invites ₹200 crore Tender for Soladevanahalli Depot of Bengaluru Suburban Rail Project
GHV India awarded ₹107.79 crore Civil Contract for Lucknow Metro East-West Corridor
Pune Metro Line 3 set to launch First 12-km Section on 15 July 2026
DMRC gets approval to Fell or Transplant 364 Trees for Central Vista Metro Corridor under Phase IV
₹4.5 Lakh crore Metro Rail Investment reaches less than 5% of Urban Population in India
West Bengal plans to launch Water Metro Systems in Kolkata
NA
Phase I
Phase II
Phase III
| Phase | Project Cost | Funding By | ||
|
₹ 37000.00 crore
|
Govt. of India and Govt. of Delhi, Uttar Pradesh,Haryana & Rajasthan |
| Phase | Line | Location | ||
| Phase I | Line 1 | Dharuhera & Alwar (Proposed) |
Not yet decided as project in now under construction.
National Capital Region Transport Corporation
GatiShakti Bhawan, INA
New Delhi - 110023
Tel: 011-24666700
Email: contactus@ncrtc.in
Website: https://www.ncrtc.in/
NA
| Package | Contractors | Work Description | |
| 1. | UMTC | Consultant for conducting a feasibility study. | |
| 2. | PricewaterhouseCoopers (PwC) | Financial Consultant on a retainer basis for planning and implementation support for the implementation of RRTS in Delhi-NCR. | |
| 3. | CRRI | Noise and Vibration Consultant. | |
| 4. | CEG Test House and Research Centre Pvt Ltd. | Detailed Geotechnical investigation work for the elevated section from IDPL Complex to Dharuhera & Geotechnical Investigation: Sarai Kale Khan to IDPL Complex in Gurgaon | |
| 5. | GR Infraprojects | Construction of 8.5 km elevated viaduct and three RRTS stations (Rajiv Chowk, Sector 17 Gurugram, Udyog Vihar) in Gurugram Area. (Contract Value - Rs 592.17 crore) | |
| 6. | URS Scott Wilson – CEG JV | Feasibility Study for connecting SNB Urban Complex to Sotanala RIICO Industrial Area | |
| 7. | S S Solution | Final Location Survey, Topographic Survey & Other Misc Surveys | |
| 8. | Shree Balalji Test House Pvt. Ltd. | Geotechnical Investigation for Underground Section: Rajiv Chowk to Kherki Daula | |
| 9. | RITES | Geotechnical Investigation: Dharuhera to SNB | |
| 10. | Continental Piling & Excavation Pvt. Ltd. | Initial Pile Load Test: IDPL Complex in Gurgaon to Dharuhera & Initial Pile Load Test: Dharuhera to SNB | |
| 11.Detailed Design Consultant (DDC) | L&T Infrastructure Engineering Ltd. | Gurgaon section – viaduct from IDPL Ramp to Rajiv Chowk Ramp, and 3 stations | |
| 12.Package 3 | GR Infraprojects(KEC – CCECC JV subcontracted partial works) | Construction of 10 km Gurgaon section: viaduct from IDPL Ramp to Rajiv Chowk Ramp with 3 stations | |
| 13.Detailed Design Consultant (DDC): 7 | SYSTRA – AECOM JV | Stations between Panchgaon – SNB, and Dharuhera Depot | |
| 14. | Detailed Design Consultant for Design of Receiving Sub Stations cum 25 kV AC Traction Substations and 33 kV Auxiliary Main Substations, Extra High Voltage & High Voltage Cabling, 33kV Network & Auxiliary Substations, 25 kV Flexible Overhead Equipment and SCADA System, Operation Control Centre for Complete Corridor |