India launches Chamber of Railway Industries (Rail Chamber) on Good Governance Day
Bangalore Metro network gears up to grow from its current 96 km to 466 km by 2035
South Korea unveils EMU-370, Set to come World’s Second Fastest High-Speed Train
India plans record ₹1.3 Trillion Rail Safety Outlay for FY2026-27
Govt. of India approves three new corridors worth ₹12,015 crore under Delhi Metro Phase V
Delhi Metro completes 23 glorious years in public transport service in Delhi-NCR
L&T bags major electrification and systems contract for Mumbai Metro Line 4 project
Why many Global Railway OEMs struggle in India — and how they can succeed?
Saleem Ahmad takes charge as new Chairman & Managing Director (CMD) of RVNL
DMRC to implement Advanced AFC System for Bhopal and Indore Metro Rail Projects
NA
Phase I
Phase II
Phase III
| Phase | Project Cost | Funding By | ||
|
₹ 37000.00 crore
|
Govt. of India and Govt. of Delhi, Uttar Pradesh,Haryana & Rajasthan |
| Phase | Line | Location | ||
| Phase I | Line 1 | Dharuhera & Alwar (Proposed) |
Not yet decided as project in now under construction.
National Capital Region Transport Corporation
GatiShakti Bhawan, INA
New Delhi - 110023
Tel: 011-24666700
Email: contactus@ncrtc.in
Website: https://www.ncrtc.in/
NA
| Package | Contractors | Work Description | |
| 1. | UMTC | Consultant for conducting a feasibility study. | |
| 2. | PricewaterhouseCoopers (PwC) | Financial Consultant on a retainer basis for planning and implementation support for the implementation of RRTS in Delhi-NCR. | |
| 3. | CRRI | Noise and Vibration Consultant. | |
| 4. | CEG Test House and Research Centre Pvt Ltd. | Detailed Geotechnical investigation work for the elevated section from IDPL Complex to Dharuhera & Geotechnical Investigation: Sarai Kale Khan to IDPL Complex in Gurgaon | |
| 5. | GR Infraprojects | Construction of 8.5 km elevated viaduct and three RRTS stations (Rajiv Chowk, Sector 17 Gurugram, Udyog Vihar) in Gurugram Area. (Contract Value - Rs 592.17 crore) | |
| 6. | URS Scott Wilson – CEG JV | Feasibility Study for connecting SNB Urban Complex to Sotanala RIICO Industrial Area | |
| 7. | S S Solution | Final Location Survey, Topographic Survey & Other Misc Surveys | |
| 8. | Shree Balalji Test House Pvt. Ltd. | Geotechnical Investigation for Underground Section: Rajiv Chowk to Kherki Daula | |
| 9. | RITES | Geotechnical Investigation: Dharuhera to SNB | |
| 10. | Continental Piling & Excavation Pvt. Ltd. | Initial Pile Load Test: IDPL Complex in Gurgaon to Dharuhera & Initial Pile Load Test: Dharuhera to SNB | |
| 11.Detailed Design Consultant (DDC) | L&T Infrastructure Engineering Ltd. | Gurgaon section – viaduct from IDPL Ramp to Rajiv Chowk Ramp, and 3 stations | |
| 12.Package 3 | GR Infraprojects(KEC – CCECC JV subcontracted partial works) | Construction of 10 km Gurgaon section: viaduct from IDPL Ramp to Rajiv Chowk Ramp with 3 stations | |
| 13.Detailed Design Consultant (DDC): 7 | SYSTRA – AECOM JV | Stations between Panchgaon – SNB, and Dharuhera Depot | |
| 14. | Detailed Design Consultant for Design of Receiving Sub Stations cum 25 kV AC Traction Substations and 33 kV Auxiliary Main Substations, Extra High Voltage & High Voltage Cabling, 33kV Network & Auxiliary Substations, 25 kV Flexible Overhead Equipment and SCADA System, Operation Control Centre for Complete Corridor |