Mumbai-Nagpur High Speed Rail: Project Information, Routes, Fares and other Details

Sangeeta Singh Posted on: 2022-01-31 12:29:00 Viewer: 2,578 Comments: 0 Country: India City: Mumbai

Mumbai-Nagpur High Speed Rail: Project Information, Routes, Fares and other Details

General Information

Project Summary

  • Project Name: Mumbai-Nagpur High Speed Rail (Bullet Train) Project
  • Owner: Indian Railways
  • Executing Agnecy: National High Speed Rail Corporation Limited
  • Project Type: High Speed Rail (HSR)
  • Project Cost: Rs 1.18 Lakh Crore (Approx.)
  • Route Length: 736 km
  • Train Speed: 300 kmph
  • Journey Fare: TBD
  • Journey Hours: 3.5 hours
  • Status: Under DPR stage.

Operational Routes

NA

Fares 

Not yet decided as project in now under construction.

Contact details

National High Speed Rail Corporation Limited (NHSRCL)
2nd FLOOR, ASIA BHAWAN, ROAD NO-205
SEC-09, DWARKA, New Delhi -110077  

Tel: 011-28070000/01/02/03/04

Email: NA

Website: https://nhsrcl.in

Route Map

NA

Project Information

  • Route Length: 736 km [At grade (596 km), elevated (110 km) and underground(30 km)]
  • Total Stations: 12
  • Station Names: Shahpur, Igatpuri, Nashik, Shirdi, Aurangabad, Jalna, Mehkar, Malegaon, KaranjaLad, Pulgaon, Wardha and Nagpur.

Project Cost & Funding:

NA

 Deadline: 2028

Technical Information

  • Design Speed: 350 kmph
  • Average Speed: 250 kmph
  • Track Gauge: Standard Gauge – 1,435 mm
  • Electrification: 25 kv AC 50 Overhead catenary
  • Signalling System: ETCS Level-2 of ERTMS
  • Rolling stock: NA

Major Contractors 

  • ADIF-INECO JV: For the preparation of Feasibility Study for the project.  
  • DIMMTS Ltd: For carrying out traffic and ridership study of the project.  
  • Satra Service & Solutions: For Data Collection and Associated Survey Work for preparation of DPR.
  • SECON-Helika JV: For Final Alignment Design including Aerial LiDAR Survey for preparation of DPR.
  • Holtec Consulting: For the preparation of General Arrangement Drawings (GADs) over Rivers, Canals, Railways and Roads.  
  • Monarch Surveyors & Engineering Consultants: For the preparation of Social Impact Assessment (SIA) and Resettlement Action Plan (RAP).
  • GPS Technologies -Shri Krishna Enviro JV: For conducting Environmental Impact Assessment (EIA) Study. 

Progress So Far

NA

  