Lisha Engineers bags ₹138.70 crore Sanoth Depot Contract for Delhi Metro's Rithala-Kundli Corridor
India commissions 1,506-km dedicated freight railway corridor connecting JNPA to New Dadri
Exclusive Interview with Uwe Sperber, Site Manager, Hubner Interface Systems India
Bangalore Metro floated tender for 13.8-km Phase-3 Double-Decker Rail Infrastructure
AECOM–NIPPON KOEI JV appointed as PMC Consultant for Chennai Metro Phase 1 capacity enhancement
EPC Leader Larsen & Toubro Ltd (L&T) joins Chamber of Railway Industries as Corporate Member
Contractor prequalification deadline for Dubai Metro Gold Line is extended to October 9
Indore Metro Rail Network expands to 17 km as Priority Corridor 2 opened to public
Jaffer PC appointed as Managing Director of Bangalore Metro Rail Corporation (BMRC)
CMRL appoints Systra to prepare Multi-Modal Integration DPR for Chennai Metro Phase 1 stations
In the bustling urban landscape of Noida, India, an ambitious transformation is underway with the development of an extensive metro rail network. With three metro rail lines spanning a combined length of 44.7 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 11,185 cr. INR, this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Noida Metro project was started on 25 January 2019 and the system is now covering a total of 29.7 km with 1 lines. By the end of 2026, the Noida Metro will cover a total network of 44.7 kilometers.
#1 Aqua Line: Noida City Centre - Noida Extention (44.65 km) Operational (29.70 km), Under Construction (14.95 km)
#Line 2: Noida Sector 142 - Botanical Garden (14 km) Proposed
#Line 3: Greater Noida Knowledge Park II – Jewar Airport (35.64 km) Proposed
Phase-I
Line 1 Extension (Aqua Line): Noida Sec 71 - Knowledge Park V
Line 2: Noida Sector 142 - Botanical Garden
New Line – Greater Noida Knowledge Park II – Jewar Airport
Phase I - Line 1 (Aqua) - Greater Noida Sector 34 (Operational)
for Normal Day’s
1 Station - ₹10
2 Stations - ₹15
3 to 6 Stations - ₹20
7 to 9 Stations - ₹30
10 to 16 Stations - ₹40
> 17 Stations - ₹50
for Sunday & National Holiday’s
1 Station - ₹10
2 Stations - ₹10
3 to 6 Stations - ₹15
7 to 9 Stations - ₹20
10 to 16 Stations - ₹30
> 17 Stations - ₹40
Noida Metro Phase 1 | Noida Metro Phase 2
Noida Metro Rail Corporation Limited
Block-III, 3rd Floor, Ganga Shopping Complex,
Sector-29, Noida 201301
Tel: 120-2450663/64/65
Email: nmrcnoida@gmail.com
Website: www.nmrcnoida.com