Exclusive Interview with Uwe Sperber, Site Manager, Hubner Interface Systems India
Bangalore Metro floated tender for 13.8-km Phase-3 Double-Decker Rail Infrastructure
AECOM–NIPPON KOEI JV appointed as PMC Consultant for Chennai Metro Phase 1 capacity enhancement
EPC Leader Larsen & Toubro Ltd (L&T) joins Chamber of Railway Industries as Corporate Member
Contractor prequalification deadline for Dubai Metro Gold Line is extended to October 9
Indore Metro Rail Network expands to 17 km as Priority Corridor 2 opened to public
Jaffer PC appointed as Managing Director of Bangalore Metro Rail Corporation (BMRC)
CMRL appoints Systra to prepare Multi-Modal Integration DPR for Chennai Metro Phase 1 stations
BEML secures additional ₹180.60 crore Rolling Stock Order for Vande Bharat Sleeper Trainsets
Titagarh Rail Systems and Siemens join hands to explore Global Metro Rolling Stock opportunities
Bengaluru, India (Rail & Metro Today): The Bangalore Metro Rail Corporation Limited (BMRCL) has invited bids through two major tenders with a combined estimated value of ₹2,811.75 crore for the development of double-decker metro infrastructure and seven metro stations under Bengaluru Metro Phase-3.
The two tenders, valued at ₹1,415.65 crore and ₹1,396.10 crore, respectively, cover a combined length of approximately 13.80 km. The contracts represent a major construction opportunity for qualified metro contractors, EPC companies, civil infrastructure firms and railway infrastructure specialists.
The Phase-3 tenders focus on the construction of double-decker metro structures, a design approach that enables metro infrastructure to share a common elevated corridor with road infrastructure. Such integrated structures are particularly relevant for Bengaluru, where limited road space and high traffic volumes make conventional standalone infrastructure challenging along several major corridors.
The two packages together cover approximately 13.80 km and include the development of seven metro stations. The large-value contracts are expected to involve substantial civil and structural engineering works associated with elevated metro infrastructure and station development.
The tenders have been issued by BMRCL as part of the wider Phase-3 programme aimed at expanding Namma Metro's network and improving connectivity across Bengaluru.
The combined tender value of ₹2,811.75 crore makes these among the significant upcoming civil construction packages associated with Bengaluru Metro Phase-3.
The first tender has an estimated value of ₹1,415.65 crore, while the second is valued at ₹1,396.10 crore. Together, they provide substantial opportunities for companies with expertise in elevated metro construction, large-scale concrete and steel structures, station construction, viaduct works and associated railway infrastructure.
According to Mrs. Mamta Shah, MD & CEO, Urban Infra Group, the use of double-decker infrastructure can offer important advantages for a densely developed city such as Bengaluru.
“Bengaluru requires innovative infrastructure solutions that can maximise the use of limited urban right-of-way. Double-decker metro structures provide an opportunity to integrate transport infrastructure within constrained corridors while supporting the expansion of mass transit. The ₹2,811 crore tender packages also underline the scale of investment and construction activity expected as Phase-3 moves forward.”
Bengaluru Metro Phase-3 is part of BMRCL's broader strategy to expand the reach of Namma Metro and provide stronger connectivity to major residential, commercial and employment areas.
The adoption of double-decker structures on selected sections reflects the need to develop metro infrastructure within Bengaluru's existing urban environment while addressing road congestion and right-of-way constraints. By combining different transportation infrastructure elements within the same corridor, the approach can potentially reduce the requirement for additional land compared with separate infrastructure corridors.
The new tender packages will therefore be important not only from a construction perspective but also in demonstrating how integrated urban transport infrastructure can be implemented in a heavily congested metropolitan environment.
With the two new packages covering 13.80 km and seven stations, the latest tenders add another substantial component to BMRCL's Phase-3 construction pipeline.
The packages are expected to attract participation from experienced infrastructure and metro construction companies meeting the prescribed technical and financial eligibility requirements. Successful contractors will play a key role in delivering the structural backbone of the Phase-3 network.
The release of these tenders indicates continued momentum in Bengaluru's metro expansion programme. As additional packages progress through tendering and award stages, Phase-3 is expected to further strengthen Namma Metro's role as a high-capacity public transport system and contribute to the city's long-term mobility strategy.
The ₹2,811.75 crore combined tender opportunity also highlights the growing scale of India's metro construction market, with innovative engineering solutions such as double-decker metro corridors increasingly being considered to address the infrastructure challenges of rapidly expanding cities.