Mumbai–Ahmedabad Bullet Train cost rises to ₹2.03 Lakh crore; ₹92,761 crore spent by March 2026
Global Rail & Metro Infrastructure Market to Reach USD 462.13 Billion by 2033
Malaysia awards RM2.69 billion contract for Penang Mutiara Line’s Cross-Sea LRT Extension
Afcons Infrastructure wins ₹876.51 crore contract for Pune Metro Viaduct and Elevated Road Project
SYSTRA–led JV wins ₹228.78 crore Design Consultancy Contract for two 350 kmph Bullet Train Corridors
Paras Railtech wins ₹84.72 crore Ballastless Track Contract for Jaipur Metro Phase 1C Project
SYSTRA India wins DPR Consultancy Contract for Chennai Metro Phase II Corridor 5 Extension
BEML plans manufacturing of Tunnel-Boring Machines for upcoming Rail & Infra projects in India
PM Narendra Modi inaugurates 7.5-km elevated stretch of Bangalore Metro Pink Line
Dilip Buildcon wins ₹419.47 crore Civil Contract for Gurugram Metro Depot and Workshop Project
(Representative Image)
Chennai, India (Metro Rail Today): In a significant stride towards enhancing urban connectivity, the Chennai Metro project achieved a major milestone as Italian-Thai Development Public Company Limited (ITD) successfully lowered the first Tunnel Boring Machine (TBM) for Line 4. This accomplishment marks a pivotal step forward in the construction of the Chennai Metro Line 4, contributing to the city's modern and efficient transportation network.
The TBM, a colossal piece of engineering marvel, will play a central role in the excavation and construction of underground tunnels, revolutionizing the way people traverse the city. Its deployment underscores the Chennai Metro's commitment to providing citizens with safe, reliable, and comfortable transportation options.
This achievement is not only a testament to technological prowess but also to collaboration between nations. With ITD, a globally recognized infrastructure development company, at the helm, the project showcases the fusion of international expertise and local aspirations.
Chennai's Metro Line 4 is a vital component of the city's comprehensive metro network. Spanning 26.09 kilometers, this line will connect the core areas of the city, easing traffic congestion and reducing travel time for thousands of residents and commuters. The lowered TBM symbolizes the commencement of a transformative journey that will ultimately result in improved urban mobility and enhanced quality of life for Chennai's citizens.
As Chennai Metro Line 4 inches closer to its completion, the successful lowering of the first TBM is a momentous event that underscores the city's commitment to modernizing its transportation infrastructure. This development not only signifies a remarkable engineering achievement but also heralds a future of seamless connectivity, efficient transportation, and sustainable urban growth.
For more details, please explore Chennai Metro Rail page of Metro Rail Today