L&T–Sojitz JV bags Electrification Contract of Mumbai–Ahmedabad High Speed Train Project

MRT Online Desk Posted on: 2024-01-15 16:30:00 Viewer: 1,111 Comments: 0 Country: India City: New Delhi

L&T–Sojitz JV bags Electrification Contract of Mumbai–Ahmedabad High Speed Train Project

New Delhi, India (Metro Rail Today): In a significant stride towards the realization of India's ambitious Mumbai – Ahmedabad High-Speed Rail (MAHSR) project, the National High Speed Rail Corporation Ltd. (NHSRCL) announced on Monday that the Larsen & Toubro – Sojitz Corporation Consortium secured the electrification contract EW-1. This contract, a vital component of the MAHSR Bullet Train project, marks a crucial step forward in enhancing the country's high-speed rail infrastructure.

The electrification contract, denoted as EW-1, is a cornerstone in the comprehensive development of the 508 km Mumbai – Ahmedabad High-Speed Rail corridor. While the exact financial details of the contract were not disclosed in the NHSRCL's press release, the final value is anticipated to be revealed when Larsen & Toubro (L&T) discloses it to the Bombay Stock Exchange, expected later today (Tuesday).

The scope of Electrification Package EW-1 encompasses the design, manufacture, supply, construction, installation, testing, and commissioning of a 2 x 25 kV overhead electrification (OHE) system. This system is meticulously crafted to accommodate the high-speed Shinkansen trains, facilitating operational speeds of up to 320 km/hour. The package extends beyond the electrification system, encompassing traction substations, switching substations, distribution systems, associated buildings, and training institute equipment.

Three strategically located depots form an integral part of the electrification package, enhancing the project's operational efficiency. These depots are situated in Thane (Package D1), Surat (Part of Package C4), and Sabarmati (Package D2).

The NHSRCL initiated the bidding process for Electrification Package EW-1 in December 2022, followed by the unveiling of technical bids in July 2023. While a comprehensive list of bidders and their corresponding bid values remains undisclosed, the transparency of this information could provide valuable insights into the competitive landscape. Any reader privy to this data is encouraged to share it through comments or the Contact page for documentation purposes.

NHSRCL's vision for the Mumbai – Ahmedabad High-Speed Rail emphasizes the holistic development of the corridor. The electrification contract aligns with the broader goal of creating a state-of-the-art rail network that not only facilitates high-speed travel but also integrates advanced infrastructure, training facilities, and strategically positioned depots.

This marks the second triumph for the Larsen & Toubro – Sojitz Corporation Joint Venture in the MAHSR project, following the award of the Sabarmati Depot (Package D2) in December 2022. At an individual level, this success contributes to L&T's formidable track record, constituting its 8th major win within the project. Previous victories include civil packages C3, C4, C5, C6, D2, and system packages P4 (X & Y) and T3.

The electrification contract EW-1 stands as a testament to the collaborative efforts driving India's high-speed rail aspirations. As L&T and Sojitz Corporation contribute their expertise to this transformative project, the Mumbai – Ahmedabad High-Speed Rail inches closer to becoming a reality. The electrification of this corridor not only ensures operational efficiency but also lays the foundation for a sustainable and advanced transportation network.

  




Also Read




Leave Your Comment!









Recent Comments!

No comments found...!