Mumbai Metro: Project Information, Routes, Fares and other Details

Sangeeta Singh Posted on: 2022-01-25 12:36:00 Viewer: 5,654 Comments: 0 Country: India City: Mumbai

Mumbai Metro: Project Information, Routes, Fares and other Details

In the bustling urban landscape of Mumbai, India, an ambitious transformation is underway with the development of an extensive metro rail network. With fourteen metro rail lines spanning a combined length of 337.1 kilometers, this transformative project is poised to revolutionize the city's transportation landscape. Backed by a substantial project cost of Rs. 140,202 cr. INR, this metro rail endeavor is not only set to ease commuter congestion but also foster sustainable urban growth and connectivity for years to come. The metro train operation in the first Phase of the Mumbai Metro project was started on 08 June 2014 and the system is now covering a total of 46.39 km with 2 lines. By the end of 2028, the Mumbai Metro will cover a total network of 337.1 kilometers.

Project Summary

  • Project Name: Mumbai Metro Rail Project
  • Nodal Body: Mumbai Metropolitan Region Development Authority (MMRDA)
  • Owner: Govt. of India and Govt. of Maharashtra
  • Project Type: Mass Rapid Transit System (MRTS)
  • Total Network Planned: 339.6 km
  • Estimated Project Cost: ₹1,53,384 Crore
  • Operation Network: 11.4 km
  • Operational Since: 8th June 2014

Project Details

#1 Blue Line: Versova – Ghatkopar (11.4 km) Operational

#2A Yellow Line: Dahisar East – Andheri (18.5 km) Operational

#2B Yellow Line: ESIC Nagar – Mandale (23.64 km) Under Construction

#3 Aqua Line: Cuffe Parade – Aarey (35.9 km) Under Construction

#4 Green Line: Wadala TT -  Kasarvadavali (32.32 km) Under Construction

# 4A Green Line: Kasarvadivli – Gaimukh (2.7 km) Under Construction

#5 Orange Line: Thane – Kalyan (24.9 km) Under Construction

#6 Pink Line: Lokhandwala – Kanjurmarg (14.47 km) Under Construction

#7 Red Line: Dahisar East - Andheri East (16.49 km) Operational

#7A Red Line: Andheri East – CSIA (3.17 km) Under Constructio

#8 Gold Line: CSIA – NMIA (35 km) Proposed

#9 Red Line: Dahisar East – Bhayandar (10.41 km) Under Construction

#10 Green Line: Gaimukh - Shivaji Chowk (Mira Road) (9.20 km) Approved

Operational Routes (Phase 1)

Blue Line 1: Varsova - Ghatkopar

  • Length: 11.4 km
  • No. of Stations: 12 (elevated)
  • Project Cost: ₹2,356 crores
  • Start date of operation: 8 June 2014
  • Operator: Mumbai Metro One Pvt. Ltd. (A JV of Reliance Infra and RATP Dev-Transdev Asia)
  • Station Names: Versova, D.N. Nagar, Azad Nagar, Andheri, Western Express Highway, Chakala, Airport Road, Marol Naka, Saki Naka, Asalpha, Jagruti Nagar, Ghatkopar
  • Depot: DN Nagar

Yelloew Line 2A:  Dahisar East - D. N. Nagar

  • Length: 18.5 km
  • Type: Elevated
  • Project Cost: ₹6,410 crore
  • Number of Stations: 17
  • Station Names: Dahisar East, Anand Nagar, Kandarpada, Mandapeshwar, Eksar, Borivali West, Shimpoli, Kandivali West, Dahanukarwadi, Valnai - Meeth Chowky, Malad West, Lower Malad, Bangur Nagar, Goregaon West, Oshiwara, Lower Oshiwara and Andheri West.

Red Line 7:  Dahisar East -  Gundavali (Andheri East)

  • Length: 16.49 km
  • Type: Elevated
  • Project Cost: ₹ 6208 crore
  • Number of Stations: 14
  • Station Names: Dahisar (East), Ovaripada, National Park, Devipada, Magathane, Mahindra & Mahindra, Bandongri, Pushpa Park, Pathan Wadi, Aarey, Mahanand, JVLR Junction, Shankarwadi, and Gundavali (Andheri East).

Project Information

Under Construction Lines 

Yellow Line 2B: DN Nagar - Mandale

  • Length: 23.643 km
  • No. of Stations: 22 (elevated)
  • Project Cost: ₹10,986 crores
  • Deadline: June 2024
  • Station Names: ESIC Nagar, Prem Nagar, Indira Nagar Nanavati Hospital, Khira Nagar, Saraswat Nagar, National College, Bandra Metro, MMRDA, ITO-BKC, IL&FS-BKC, MTNL-BKC, SG Barve Marg, Kurla Terminus, Kurla (East), Eastern Express Highway, Chembur, Diamond Garden, Shivaji Chowk, BSNL, Mankhurd and Mandale.

Aqua Line 3: Cuffe Parade - Aarey Depot (Colaba–Bandra-SEEPZ)

  • Length: 35.9 km
  • No. of Stations: 27 (26 underground, 1 at-grade)
  • Project Cost: ₹33,406 crores
  • Deadline: Feb. 2022-23
  • Station Names: Cuffe Parade, Vidhan Bhavan, Churchgate, Hutatma Chowk, CST, Kalbadevi, Girgaon, Grant Road, Mumbai Central, Mahalaxmi, Science Museum, Acharya Atrey Chowk, Worli, Siddhivinayak, Dadar, Shitladevi Temple, Dharavi, BKC, Vidyanagri, Santacruz, CSIA Domestic, Sahar Road, CSIA International, Marol, MIDC, SEEPZ and Aarey.

Green Line 4: Wadala - Kasarvadavali

  • Length: 32.32 km
  • No. of Stations: 32 (elevated)
  • Project Cost: ₹14,549 crores
  • Deadline:  Feb.2024
  • Station Names: Bhakti Park Metro, Wadala TT, Anik Nagar Bus Depot, Suman Nagar, Siddharth Colony, Amar Mahal Junction, Garodia Nagar, Pant Nagar, Laxmi Nagar, Shreyas Cinema, Godrej Company, Vikhroli Metro, Surya Nagar, Gandhi Nagar, Naval Housing, Bhandup Mahapalika, Bhandup Metro, Shangrila, Sonapur, Mulund Fire Station, Mulund Naka, Thane Teen Haath Naka, RTO Thane, Mahapalika Marg, Cadbury Junction, Majiwada, Kapurbawdi, Manpada, Tikuji-Ki-Wadi, Dongari Pada, Vijay Garden, Kasarvadavali

Green Line 4A: Kasarvadivli - Gaimukh

  • Length: 2.7 km
  • No. of Stations: 2 (elevated)
  • Project Cost: ₹949 crores
  • Deadline: Feb.2024
  • Station Names: Gowanipada, Gaimukh

Orange Line 5: Thane - Kalyan

  • Length: 24.9 km
  • No. of Stations: 17 (elevated)
  • Project Cost: ₹8,417 crores
  • Deadline: Oct.2024
  • Station Names: Kapurbawdi, Balkum Naka, Kasheli, Kalher, Purna, Anjur Phata, Dhamankar Naka, Bhiwandi, Gopal Nagar, Temghar, Rajnouli Village, Goregaon MIDC, Kongaon, Durgadi Fort, Sahajanand Chowk, Kalyan Railway Station, Kalyan APMC.

Pink Line 6: Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg

  • Length: 14.47 km
  • No. of Stations: 13 (elevated)
  • Project Cost: ₹6,716 crores
  • Deadline: Feb.2024
  • Station Names: Swami Samarth Nagar, Adarsh Nagar, Jogeshwari West, Jogeshwari-Vikhroli Link Road, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg West, and Vikhroli-Eastern Express Highway.

Red Line 7A: Andheri (East) - CSIA

  • Length: 3.17 km
  • No. of Stations: 2 (1 elevated, 1 underground)
  • Project Cost: ₹600 crores
  • Deadline: October 2024

Proposed

Gold Line 8: CSIA - NMIA

  • Length: 35 km
  • Project Cost: ₹15,000 crores
  • Deadline: October 2026

Under Construction

Red Line 9: Dahisar East - Bhayandar

  • Length: 10.41 km
  • No. of Stations: 9 (elevated)
  • Project Cost: ₹6,007 crores
  • Deadline: October 2024
  • Station Names: Pandurang Wadi, Amar Palace, Zankar Company, Sai Baba Nagar, Deepak Hospital, Shahid Bhagat Singh Garden, Subhash Chandra Bose Stadium, MBMC Sports Complex and Indiralok. 

Green Line 10: Gaimukh - Shivaji Chowk (Mira Road)

  • Length: 9.209 km
  • No. of Stations: 4 (elevated)
  • Project Cost: ₹4,476 crores
  • Deadline: October 2024
  • Station Names: Gaimukh Reti Bundar, Varsova Char Phata, Kashimira and Shivaji Chowk (Mira Road).

Green Line 11: Wadala to Chhatrapati Shivaji Maharaj Terminus

  • Length: 12.774 km
  • No. of Stations: 10 (2 elevated, 8 underground)
  • Project Cost: ₹8,739 crores
  • Deadline: October 2026
  • Station Names: Wadala RTO, Ganesh Nagar, BPT Hospital, Sewri, Hay Bunder, Coal Bunder, Darukhana, Wadi Bunder, Clock Tower, Carnac Tower and CSMT.

Orange Line 12: Kalyan - Taloja

  • Length: 20.756 km
  • No. of Stations: 18 (elevated)
  • Project Cost: ₹5,865 crores
  • Deadline: October 2024
  • Station Names: Kalyan APMC, Ganesh Nagar (Kalyan), Pisavali Gaon, Golavali, Dombivali MIDC, Sagaon, Sonarpada, Manpada (Dombivali East), Hedutane, Kolegaon, Nilaje Gaon, Vadavali, Bale, Waklan, Turbhe, Pisarve Depot, Pisarve and Taloja.

Purple Line 13: Shivaji Chowk - Virar

  • Length: 23 km (Elevated)
  • Project Cost: ₹6,900 crores
  • Deadline: October 2026

Magenta Line 14: Kanjurmarg - Badlapur

  • Length: 45 km (Elevated)
  • Project Cost: ₹13,500 crores
  • Deadline: October 2026

Train Maintanance Depot

Phase I - Line 1 (Blue) - DN Nagar (Operational)

Phase I - Line 2 (Yellow) - Malvani in Charkop (Operational), Mandale (Under Construction)

Phase I - Line 7 (Red) - Dahisar East (Operational)

Phase II - Line 3 (Aqua) - Aarey Colony (Under Construction)

Fares 

0-2 Station - ₹10

2-4 Station - ₹20

5-8 Station - ₹30

9-12 Station - ₹40

Route Map

Click to view on Google Maps

Technical Information

  • Design Speed: 80 kmph
  • Average speed: 33 kmph
  • Track Gauge: 1,435 mm Standard gauge
  • Electrification: 25 kV 50 Hz AC through
  • Signalling System: Communications-based Train Control (CBTC)
  • Rolling stock:  NA

Key Dates

  • June 2006: Foundation stone laid down by Prime Minister Narendra Modi.(Phase I)
  • February 2008: Construction work started of Mumabi Metro Phase I.
  • 8 June 2014: Versova – Ghatkopar ( Line 1/Phase 1) 11.4 km.
  • 2 April 2022: Dahisar (East) – Dahanukarwadi (Line 2A/Phase 1) 9.8 km.
  • 2 April 2022:Dahisar (East) – Aarey (Line 7/Phase 1) 10.7 km.
  • 19 january 2023: Dahanukarwadi - Andheri West (Line 2A/Phase 2) 8.8 km.
  • 19 january 2023:  Aarey – Gundavali (Line 7/Phase 2) 5.8 km.

In-depth Information

Blue Line | Yellow Line Red Line | Aqua Line | Green Line Orange Line | Pink Line

Metro Authority Contact details

Mumbai Metropolitan Region Development Authority

BANDRA-KURLA COMPLEX,

C-14 & 15, E BLOCK BANDRA

(EAST)400 051

Tel: 22-26594000

Email: NA

Website: mmrda.maharashtra.gov.in

  




Also Read




Leave Your Comment!









Recent Comments!

No comments found...!