Mumbai Metro Yellow Line: Project Information, Cost, Contractors and System Details

Sangeeta Singh Posted on: 2022-01-25 12:36:00 Viewer: 6,448 Comments: 0 Country: India City: Mumbai

Mumbai Metro Yellow Line: Project Information, Cost, Contractors and System Details

General Information

Project Summary

  • Project Name: Mumbai Metro Rail Project
  • Nodal Body: Mumbai Metropolitan Region Development Authority (MMRDA)
  • Owner: Govt. of India and Govt. of Maharashtra
  • Project Type: Mass Rapid Transit System (MRTS)
  • Total Network Planned: 339.6 km
  • Estimated Project Cost: ₹1,53,384 Crore
  • Operation Network: 11.4 km
  • Operational Since: 8th June 2014

Project Information

Yellow Line – Line-2A: Dahisar East – D.N. Nagar

  • Length: 18.589 km
  • Type: Elevated
  • Depot: Malvani in Malad West
  • Number of Stations: 17
  • Oprational: Dahisar East, Anand Nagar, Kandarpada, Mandapeshwar, Eksar, Borivali West, Shimpoli, Kandivali West, Dahanukarwadi, Valnai - Meeth Chowky, Malad West, Lower Malad, Bangur Nagar, Goregaon West, Oshiwara, Lower Oshiwara and Andheri West.
  • Estimated Cost: Rs. 6,410 crore
  • Estimated Ridership: 4.07 lakh/day (2021); 6.09 lakh/day (2031)

Yellow Line – Line-2B: D.N. Nagar – BKC – Mandale

  • Length: 23.649 km
  • Number of Stations: 22 (Elevated)
  • Station Names: ESIC Nagar, Prem Nagar, Indira Nagar, Nanavati Hospital, Khira Nagar, Saraswat Nagar, National College, Bandra, MMRDA Office, Income Tax office (ITO), ILFS, MTNL Metro, SG Barve Marg, Kurla Terminal, Kurla (E), EEH, Chembur, Diamond Garden, Shivaji Chowk, BSNL, Mankhurd & Mandale
  • Depot: Mandale 

Project Cost & Funding:

Phase   Project Cost    Funding By
Yellow Line 2A   6,410 Crore   Govt. of India and Govt. of Maharashtra
Yellow Line 2B   10,986 Crore   Govt. of India and Govt. of Maharashtra

 Deadline: 2A (March 2022), 2B (June 2024)

System Information

  • Design Speed: 80 kmph
  • Average speed: 33 kmph
  • Track Gauge1,435 mm Standard gauge
  • Electrification: 25 kV 50 Hz AC through
  • Signalling System: Communications-based Train Control (CBTC)
  • Rolling stock:  NA

Major Contractors

  • Delhi Metro Rail Corporation (DMRC): Implementing Agency  
  • AYESA – ITALFERR – CEG JV (Line-2B): General Consultant (GC)  
  • AECOM (Entire Line-2): Detailed Design Consultant 
  • SYSTRA MVA Consulting India Pvt. Ltd. ( DDC): Detailed Design Consultant (DDC) for Stations, Mandale Depot, Staff Quarters & Aux Structures  
  • S.P. Enterprises: Survey, Measurement, Georeferencing, Demarcation and Preparing Maps for Metro Line-2A  
  • Alstom Transport India Ltd. – Alstom Transport SA (MS-01): Train Control, CBTC Signaling and Telecommunication system  
  • BEML (MRS1): Rolling Stock (576 Coaches for Yellow & Red lines  
  • Datamatics Global Services Limited (DGSL) and AEP Ticketing solutions S.R.L, Italy (AEP) (CA-33): Automatic Fare Collection (AFC) system  
  • KTK Group (MS-03): Half Height Platform Screen Doors (PSDs)  
  • Mavin Switchgears and Control Pvt. Ltd. (AE-01): 110 kV Receiving + 25kV AC Traction + 33 kV Auxiliary Main Sub Stations at DN Nagar and Charkop Depot  
  • Sterling and Wilson – Cimechel Electric Company JV (AE-02R1): 25 kV Overhead Equipment (OHE), 33 kV Auxiliary Power Supply, SCADA System  
  • Jakson Limited (AE-03): E&M at Charkop Depot & 17 elevated stations of Line-2A  
  • Johnson Lifts Pvt. Ltd. (AE-04): Elevators at 17 elevated stations of Line-2A  
  • Schindler India Pvt. Ltd. (AE-05R): Escalators for Line-2A  
  • Arcelor Mittal Espana (MT-1RR): Supply of 6350 MT Head Hardened Rails (UIC 60, IRS-T-12-2009, 1080 Grade) for Line-2A  
  • Jindal Steel & Power Ltd. (JSPL) (MT-3R): Supply of 1400 MT 90 UTS Rails (UIC 60, IRS-T-12-2009,880 Grade) at Charkop Depot  
  • S.C. Agarwal (MT-4): Standard Gauge Track work along with Ballasted / Ballastless tracks in Charkop Depot  
  • Paras Railtech Pvt. Ltd. (MT-5 & MT-6): Ballastless Track from Dahisar East – Kamraj Nagar & Ballastless Track from Kamraj Nagar – DN Nagar  
  • Pandrol – PRT Consortium (MT-7): Fastening System  
  • J Kumar Infraprojects Ltd – CRTG JV (AC-01 & AC-02): Construction of Dahisar East to Kamraj Nagar (viaduct and 8 stations) & Construction of Kamraj Nagar to DN Nagar (viaduct and 8 stations)  
  • Anupam Construction Co. (AC-03): Charkop Depot & Workshop – Construction & land development 
  • Ghaziabad Mechfab Pvt. Ltd. (AC-04): Charkop Depot & Workshop – Pre-engineered buildings  
  • Godrej & Boyce Mfg. Co. Ltd. (AC-05): Architectural finishing works at 5 stations (Dahisar East to Eksar)  
  • J Kumar Infraprojects Ltd. (AC-06, AC-07 & C101): Architectural finishing works at 5 stations (Don Bosco to Kamraj Nagar), Architectural finishing works at 4 stations (Charkop to Bangur Nagar) &  DN Nagar – MTNL (balance work)  
  • Himcon Engineers Pvt. Ltd. (AC-08): Architectural finishing works at 4 stations (Goregaon to DN Nagar)  
  • Pioneer Fabricators Pvt. Ltd. (V): Prefabricated steel roof structures including sheeting at 9 stations (Dahisar East to Kamraj Nagar) & Prefabricated steel roof structures including sheeting at 8 stations (Charkop to DN Nagar)  
  • Simplex Infrastructures Ltd. (CA-04R): DN Nagar to IL&FS (viaduct and 10 stations)  
  • RCC Infraventures Ltd. (CA-06): IL&FS to Chembur (viaduct & 6 stations)  
  • Niraj Cement Structurals (NCC) –  Guan JV (CA-07): Diamond Garden to Mandale (viaduct & 5 stations)  
  • RCC Infraventures Ltd. (CA-14): Mandale Depot’s Construction  
  • J Kumar, NCC & TATA Projects (C102): MTNL – Chembur (balance work)  
  • Ahluwalia Contracts (C103): Mandale Depot’s Construction (balance work)  
  • Prefab Roof Structure at Mogra (Shankarwadi) and Gundavali (Andheri) (CA-133): Eagle Infra India

Progress So Far

NA

In-depth Information