Mumbai Metro Orange Line: Project Information, Cost, Contractors and System Details

Sangeeta Singh Posted on: 2022-01-25 12:36:00 Viewer: 807 Comments: 0 Country: India City: Mumbai

Mumbai Metro Orange Line: Project Information, Cost, Contractors and System Details

General Information

Project Summary

  • Project Name: Mumbai Metro Rail Project
  • Nodal Body: Mumbai Metropolitan Region Development Authority (MMRDA)
  • Owner: Govt. of India and Govt. of Maharashtra
  • Project Type: Mass Rapid Transit System (MRTS)
  • Total Network Planned: 339.6 km
  • Estimated Project Cost: ₹1,53,384 Crore
  • Operation Network: 11.4 km
  • Operational Since: 8th June 2014

Project Information

Orange Line: Line-5 – Kapurbawdi (Thane) – Bhiwandi – Kalyan

  • Length: 24.90 km
  • Status: Under Construction (western section)
  • Type: Elevated
  • Depot: Kon Village
  • Number of Stations: 17
  • Station Names: Kapurbawdi, Balkum Naka, Kasheli, Kalher, Purna, Anjur Phata, Dhamankar Naka, Bhiwandi, Gopal Nagar, Temghar, Rajnouli Village, Govegaon MIDC, Kongaon, Durgadi Fort, Sahajanand Chowk, Kalyan Railway Station and Kalyan APMC.

Orange Line: Line-12 – Kalyan – Dombivali –  Taloja

  • Length: 20.75 km
  • Status: Proposed 
  • Number of Stations: 17 (Elevated)
  • Station Names: Ganesh Nagar, Pisvali Gaon, Golavali, Dombivli MIDC, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon, Nilaje Gaon, Vadavali, Bale, Waklan, Turbhe, Pisarve Depot, Pisarve and Taloja.

Project Cost & Funding:

Phase   Project Cost    Funding By
Orange Line 5    8,416 Crore   Govt. of India and Govt. of Maharashtra
Orange Line 12    8,416 Crore   Govt. of India and Govt. of Maharashtra

 Deadline: Oct.2024

Technical Information

  • Design Speed: 80 kmph
  • Average speed: 33 kmph
  • Track Gauge1,435 mm Standard gauge
  • Electrification: 25 kV 50 Hz AC through
  • Signalling System: Communications-based Train Control (CBTC)
  • Rolling stock:  NA

Major Contractors

  • Delhi Metro Rail Corporation (DMRC): DPR Preparer  
  • SYSTRA – Consulting Engineers Group – Systra MVA Consulting (India) Ltd. (SYSTRA – CEG JV (GC): Line-5 General Consultant   
  • Not yet finalize: Line-5 Detailed Design Consultant (DDC)  
  • Afcons Infrastructure Ltd.(Civil Package CA28): Kapurbawadi – Dhamankar Naka (12.811 km viaduct & 7 stations  
  • Jindal Steel & power (CA-159): 6800 MT of head-hardened rails for Line-5 and Line-9

Progress So Far

NA

In-depth Information

Overview |  Blue Line | Yellow Line | Red Line | Aqua Line | Green Line | Pink Line

 

  




Also Read




Leave Your Comment!









Recent Comments!

No comments found...!