Kalpataru Projects-HG Infra Engg JV bags ₹1,415 Crore EPC Contract for Thane Metro Rail Project
MAHA Metro floats ₹223.70 Crore Civil Tender for Six Elevated Stations of Thane Metro Rail Project
Construction begins on Delhi Metro Phase 4's Saket G Block–Lajpat Nagar Corridor
Kerala proposes RRTS as alternative to K-Rail Silver Line, Eyes faster clearances under Metro Policy
India’s Metro Rail Network crosses 1,080 km as Southern States drive expansion
Delhi-Meerut Namo Bharat RRTS crosses 2 Crore Commuter Trips in Two Years
PIB approves ₹12,260 crore Jaipur Metro Phase 2 Project
BEML rolls out First Driverless Metro Prototype for Bangalore Metro Phase 2 Expansion
Hyundai Rotem dispatches First High-Speed Train Set to Uzbekistan
The Quiet Engine: Incredible Story of 40 Years of Indian Railway Finance Corporation (IRFC)
Orange Line: Line-5 – Kapurbawdi (Thane) – Bhiwandi – Kalyan
Orange Line: Line-12 – Kalyan – Dombivali – Taloja
| Phase | Project Cost | Funding By | ||
| Orange Line 5 | ₹ 8,416 Crore | Govt. of India and Govt. of Maharashtra | ||
| Orange Line 12 | ₹ 8,416 Crore | Govt. of India and Govt. of Maharashtra |
Deadline: Oct.2024
NA