Mumbai Metro Green Line: Project Information, Cost, Contractors and System Details

Sangeeta Singh Posted on: 2022-01-25 12:36:00 Viewer: 481 Comments: 0 Country: India City: Mumbai

Mumbai Metro Green Line: Project Information, Cost, Contractors and System Details

General Information

Project Summary

  • Project Name: Mumbai Metro Rail Project
  • Nodal Body: Mumbai Metropolitan Region Development Authority (MMRDA)
  • Owner: Govt. of India and Govt. of Maharashtra
  • Project Type: Mass Rapid Transit System (MRTS)
  • Total Network Planned: 339.6 km
  • Estimated Project Cost: ₹1,53,384 Crore
  • Operation Network: 11.4 km
  • Operational Since: 8th June 2014

Project Information

Green Line – Line-4: Bhakti Park (Wadala) – Kasaravadavali

  • Length: 32.32 km
  • Status: Under Construction
  • Depot: Vikhroli (Godrej) – 15.50 hectares
  • Number of Stations: 32 (Elevated)
  • Stations Names: Bhakti Park, Wadala TT, Anik Bus Depot, Suman Nagar, Siddharth Colony, Amar Mahal Junction, Garodia Nagar, Pant Nagar, Lakshmi Nagar, Shreyas Cinema, Godrej Company, Vikhroli, Surya Nagar, Gandhi Nagar, Naval Housing, Bhandup Mahapalika, Bhandup, Shangrila, Dr Hedgewar Chowk, Mulund Fire Station, Maharana Pratap Chowk, Thane Teen Haath Naka, RTO Thane, Mahapalika Marg, Cadbury Junction, Majiwada, Kapurbawdi, Manpada, Tikuji-Ni-Wadi, Dongari Pada, Vijay Garden, Kasaravadavali

Green Line – Line-4A: Kasaravadavali – Gaimukh

  • Length: 2.88 km
  • Status: Under Construction
  • Depot: Mogharpada (20 hectares)
  • Number of Stations: 2 ( Elevated)
  • Station Names: Gowniwada, Gaimukh

Green Line – Line-10: Gaimukh – Shivaji Chowk (Mira Road)

  • Length: 9.209 km
  • Status: Approved
  • Type: Elevated
  • Number of Stations: 4
  • Station Names: Gaimukh Reti Bundar, Versova Chaar Phata, Kashi Mira, Shivaji Chowk

Green Line – Line-11: Bhakti Park (Wadala) – CSMT 

  • Length: 12.744 km
  • Status: Proposed
  • Depot: Wadala
  • Number of Stations: 10 (Elevated & Underground)
  • Station Names: Wadala RTO, Ganesh Nagar, BPT Hospital, Sewri, Hay Bunder, Coal Bunder, Darukhana, Wadi Bunder, Clock Tower, Carnac Tower and CSMT

Project Cost & Funding:

Phase   Project Cost    Funding By
Green Line 4    14,549 Crore   Govt. of India and Govt. of Maharashtra
Green Line 4A    949 Crore   Govt. of India and Govt. of Maharashtra
Green Line 10   ₹ 4,476 Crore   Govt. of India and Govt. of Maharashtra
Green Line 11    ₹ 8739 Crore   Govt. of India and Govt. of Maharashtra

 Deadline: 4 & 4A (Feb.2024)

Technical Information

  • Design Speed: 80 kmph
  • Average speed: 33 kmph
  • Track Gauge1,435 mm Standard gauge
  • Electrification: 25 kV 50 Hz AC through
  • Signalling System: Communications-based Train Control (CBTC)
  • Rolling stock:  NA

Major Contracts

Package   Contractors   Work Description
    DB Engineering & Consulting GmbH – Louis Berger Pvt. Ltd – Hill International   General Consultant (GC)
    SYSTRA MVA Consulting India Pvt. Ltd.   Detailed Design Consultant (DDC)
    Bombardier Transportation   Rolling Stock: 234 standard gauge coaches
    Not yet finalize   Head Hardened Rails
    Not yet finalize   Telecommunications
    Alstom Transport is lowest bidder   CBTC Signalling & Train Control, Platform Screen Doors
Civil CA-08, Civil CA-10 & Civil CA-12   Reliance – Astaldi JV   Wadala – Amar Mahal (6.2 km viaduct & 6 stations), Gandhi Nagar – Sonapur (6.7 km viaduct & 6 stations) & Kapurbawdi -Kasarvadavali (6.8 km viaduct & 6 stations)
Civil CA-09 & Civil CA-11   TPL – CHEC JV   Garodia Nagar – Surya Nagar (6.4 km viaduct & 7 stations) & Mulund Fire Station-Majiwada (7.1 km viaduct & 7 stations)
Civil CA-54   J Kumar Infraprojects   Kasarvadavali – Gaimukh (2.88 km viaduct & 2 stations)
Civil CA- L4C01   Not yet finalize   Mogharpada Depot and infrastructure

Progress So Far

NA

In-depth Information