Mumbai Metro Blue Line: Project Information, Cost, Contractors and System Details

Sangeeta Singh Posted on: 2022-01-25 12:36:00 Viewer: 1,373 Comments: 0 Country: India City: Mumbai

Mumbai Metro Blue Line: Project Information, Cost, Contractors and System Details

General Information

Project Summary

  • Project Name: Mumbai Metro Rail Project
  • Nodal Body: Mumbai Metropolitan Region Development Authority (MMRDA)
  • Owner: Govt. of India and Govt. of Maharashtra
  • Project Type: Mass Rapid Transit System (MRTS)
  • Total Network Planned: 339.6 km
  • Estimated Project Cost: ₹1,53,384 Crore
  • Operation Network: 11.4 km
  • Operational Since: 8th June 2014

Operational Routes

Blue Line 1: Varsova - Ghatkopar

  • Length: 11.4 km
  • No. of Stations: 12 (elevated)
  • Start date of operation: 8 June 2014
  • Station Names: Versova, D.N. Nagar, Azad Nagar, Andheri, Western Express Highway, Chakala, Airport Road, Marol Naka, Saki Naka, Asalpha, Jagruti Nagar, Ghatkopar
  • Depot: DN Nagar

Project Cost & Funding:

Phase   Project Cost    Funding By
 Blue Line    2,356 Crore   Govt. of India and Govt. of Maharashtra

 Deadline: NA

System Information

  • Design Speed: 80 kmph
  • Average speed: 33 kmph
  • Track Gauge1,435 mm Standard gauge
  • Electrification: 25 kV 50 Hz AC through
  • Signalling System: Communications-based Train Control (CBTC)
  • Rolling stock:  NA

Major Contracts

NA

Progress So Far

08 June 2014:Versova – Andheri – Ghatkopar (Blue Line) – 11.4 km