General Information

Project Summary

  • Project Name: Delhi-Meerut RRTS Project
  • Operator: National Capital Region Transport Corporation (NCRTC)
  • Owner: Govt. of India and Govt. of Delhi, Uttar Pradesh, Haryana & Rajasthan
  • Project Type: Mass Rapid Transit System (MRTS)
  • Project Cost: INR 30,274.00 Crores (USD 3947.7 million)
  • Funding Agency: AIIB, ADB

Operational Routes

NA

Fares 

Not yet decided as project in now under construction.

Contact details

National Capital Region Transport Corporation
GatiShakti Bhawan, INA
New Delhi - 110023 

Tel: 011-24666700

Email: [email protected]

Website: https://www.ncrtc.in

Route Map

NA

Project Information

Under Construction Routes

  • Route length: 82.15 km (Elevated-68.03 km, Underground-14.12 km, At grade-1.45 km)
  • Number of RRTS Stations: 16
  • Number of additional Stations for Meerut MRTS: 6
  • Total journey time: 55 minutes
  • Station Names: Sarai Kale Khan, New Ashok Nagar, Anand Vihar, Sahibabad, Ghaziabad, Guldhar, Duhai, Muradnagar, Modinagar South, Modinagar North, Meerut South, Partapur, Rithani, Shatabdi Nagar, Brahmpuri, Meerut Central, Bhaisali, Begumpul, Daurli, Meerut North, Modipuram.
  • Depot: Duhai, Modipuram

Project Cost & Funding:

Phase   Project Cost    Funding By
   
₹ 30,274.00 crore 
  Govt. of India and Govt. of Delhi, Uttar Pradesh,ADB,NDB 

 Deadline: 2024

Technical Information

  • Design Speed: 180 kmph
  • Average Speed: 100 kmph
  • Track Gauge: Standard Gauge – 1435 mm
  • Electrification: 25 kV, 50 Hz AC OHE
  • Signalling System: European Train Control System (ETCS)
  • Rolling stock: Bombardier Transportation 

Major Contractors 

Contractors   Work Description
DIMTS   Consultant for preparation of Public Transport Travel Demand Model for RRTS in Delhi-NCR.
PricewaterhouseCoopers (PwC)   Financial Consultant on a retainer basis for planning and implementation support for the implementation of RRTS in Delhi-NCR.
CRRI   Noise and Vibration Consultant.
Egis Rail SA INECO Egis India Consortium   Interim Detailed Design Consultancy services of Delhi-Meerut RRTS corridor.
JV of Ayesa Ingenieria Y Arquitectura   General Consultant (GC) for Delhi-Ghaziabad-Meerut RRTS Corridor.
JV of Korea Railroad Technical Corporation & M    Detailed Design Consultant (DDC) for the Detailed Design of Track for the elevated viaduct, underground sections including all stations and depots.
Ayesa India    Detailed Design Consultant (DDC) for detailed design and drawing of four numbers of elevated RRTS stations (Sahibabad, Ghaziabad, Guldhar and Duhai) in the section from Sahibabad Ramp to EPE crossing and Maintenance depot at Duhai and Modipuram.
Systra MVA Consulting   Detailed Design Consultant (DDC) for civil, architectural and E&M work of five numbers of elevated RRTS stations (Muradnagar, Modi Nagar-South, Modi Nagar-North, Meerut-South, Shatabdi Nagar) and two MRTS stations (Partapur and Rithani) and elevated viaduct after Duhai Station and Shatabdi Nagar including elevated viaduct from Duhai station to Duhai depot.
KEC-CCECC JV   Construction of elevated viaducts & ramp from Sahibabad to Ghaziabad and two RRTS stations viz. Sahibabad and Ghaziabad (Package 1).
APCO-CRFG JV   Construction of elevated viaducts & ramp from Ghaziabad to Duhai to connect Duhai depot and two RRTS stations viz. Guldhar and Duhai (Package 2)
L&T Construction   Construction of elevated viaducts & ramp from Duhai to Shatabdi Nagar and seven RRTS stations viz. Muradnagar, Modinagar South, Modinagar North, Meerut South, Partapur, Rithani and Shatabdi Nagar [Package 3 (Lot 1 & Lot 2)],Construction of elevated viaducts & ramp from Shatabdi Nagar - Brahmpuri Down Ramp and five RRTS stations viz. Brahmapuri, MES Colony, Daurli, Meerut North and Modipuram (Package 7) & Supply of Ballastless Track from Sarai Kale Khan to Modi Puram including Jangpura Stabling Yard, Duhai and Modipuram Depots (Package 17).
STEC   Construction of the underground tunnel from Ashok Vihar - Sahibabad including one station at Anand Vihar (Package 4).
VNC-KEC JV   Construction of Duhai Depot and Workshop (Package 5A).
Afcons Infrastructure    Construction of elevated viaducts & ramp from Sarai Kale Khan - New Ashok Vihar Down Ramp and two RRTS stations viz. Sarai Kale Khan and New Ashok Nagar (Package 6). &  Construction of underground section from Brahampuri Down Ramp - Begumpul Up Ramp and three RRTS stations viz. Meerut Central, Bhaisali and Begumpul (Package 8).
L&T Construction    
Sam India Builtwell   Construction of multi-storied staff quarters and connectivity from Mathura Road to Jangpura Stabling Yard (Package 9A).
ArcelorMittal España   Supply of 22,000 MT of Head Hardened Rails (Package 13).
Schwihag AG   Supply of Track Fastening System (Package 14).
Voestalpine VAE VKN India   Supply of standard gauge 60 kg UIC turnouts and scissor crossovers (Package 15)
Schindler   Supply of Escalators (Package 21).
OTIS   Supply of Elevators (Package 22).

Progress So Far

  • May 2017: Final DPR of the project approved by the Government of Uttar Pradesh.
  • February 2019: Final DPR of the project approved by the Central Government. 
  • 8 March 2019: Prime Minister Narendra Modi laid the foundation stone for this project. 
  • June 2019: Pillar Construction work started.
  • Apr 2021: Track laying started for Delhi-Meerut RRTS project in Ghaziabad section of the corridor.
  