Kolkata Metro Marks 41 Years of Service to the City of Joy
DMRC to introduce Driverless Trains on Delhi Metro Phase 4 Corridors
Karnataka proposes Centre of Excellence for Railways and Mobility Innovation
Egypt and Japan approve Greater Cairo Metro Line 4 Project
Metro Rail Today continues its legacy as Official Media Partner for 18th Urban Mobility India 2025
Alstom bags €1.4 billion contract from SNCF Voyageurs to supply 30 Very High Speed Trains
Nokia and ST Engineering partner to deploy communications network on Bangkok Metro’s Orange Line
How Mumbai Built Its Deepest Aqua Line Metro Project — And Won the City’s Heart?
Feasibility Study begins for Sitabuldi–Koradi Metro Corridor under Nagpur Metro Phase 3
Saudi Arabia’s $7 Billion Land Bridge: Building a High-Speed Future Across the Desert
The first phase of the project was initially budgeted at ₹6,395 crore. With route extensions and cost escalation, this was later revised to ₹11,609 crores. There were many delays during construction and as a result, there were several postponements. The difficult geological conditions below ground with a mix of soft soil, high groundwater levels, hard granite and large boulders was a major impediment for tunnel boring
| Line | Routes | Length | Current Status | |||
| #1 Purple Line | Benniganahalli - Kengeri | 42.53km | Operational (39.34 km), U/C (1.54 km) | |||
| #2 Green Line | Nagasandra - Silk Institute - Yelachenahalli | 36.52km | Operational (30.32 km), U/C (6.2 km) | |||
| #3 Yellow Line | RV Road - Bommasandra | 19.14km | Under Construction | |||
| #4 Pink Line | Kalena Agrahara - Nagawara | 21.38km | Under Construction | |||
| #5 Blue Line | KR Puram - KIAL Terminals | 55.23km | Under Construction | |||
| #6 Orange Line | JP Nagar 4th Phase - Kempapura | 32.15km | Approved by State Govt. | |||
| #7 (TBA) | Hosahalli - Kadabagere | 12.5km | Approved by State Govt. | |||
| #8 (TBA) | Hebbal - Sarjapur | 35.4km | Approved by State Govt. |
Line 2 (Green): Nagasandra - Silk Institute
| Phase | Project Cost | Funding By | ||
| Phase-I | ₹11,609 Crore | Govt. of India and Govt. of Karnataka |