PM Narendra Modi inaugurates Pune Metro Line 3, Launches Phase-II Projects worth ₹13,500 Crore
Parsons-Led JV selected Project Management Consultant for Riyadh Metro Red Line Extension
Vietnam signs turnkey contracts for Hanoi Metro's five driverless lines spanning 253.5 km
India’s First indigenous Bullet Trainset B28 takes shape at BEML’s Bengaluru Facility
GMRC invites bids for ₹197.14 crore Ahmedabad Metro Gyaspur Depot Development Project
Govt of India approves 1500-km Delhi–Guwahati Northern Bullet Train Corridor
Railway Board grants conditional clearance to RCF-Built Vande Bharat Trainset with Alstom Propulsion
Two Consortia Bid for General Consultancy Contract for Hyderabad Metro Phase 2 Project
RNS Infra–Gayatri Projects JV awarded ₹342 crore Civil Contract for Bengaluru Suburban Rail Project
PM Modi to inaugurate Pune Metro's Hinjewadi–Shivajinagar Metro Corridor on November 3
The first phase of the project was initially budgeted at ₹6,395 crore. With route extensions and cost escalation, this was later revised to ₹11,609 crores. There were many delays during construction and as a result, there were several postponements. The difficult geological conditions below ground with a mix of soft soil, high groundwater levels, hard granite and large boulders was a major impediment for tunnel boring
| Line | Routes | Length | Current Status | |||
| #1 Purple Line | Benniganahalli - Kengeri | 42.53km | Operational (39.34 km), U/C (1.54 km) | |||
| #2 Green Line | Nagasandra - Silk Institute - Yelachenahalli | 36.52km | Operational (30.32 km), U/C (6.2 km) | |||
| #3 Yellow Line | RV Road - Bommasandra | 19.14km | Under Construction | |||
| #4 Pink Line | Kalena Agrahara - Nagawara | 21.38km | Under Construction | |||
| #5 Blue Line | KR Puram - KIAL Terminals | 55.23km | Under Construction | |||
| #6 Orange Line | JP Nagar 4th Phase - Kempapura | 32.15km | Approved by State Govt. | |||
| #7 (TBA) | Hosahalli - Kadabagere | 12.5km | Approved by State Govt. | |||
| #8 (TBA) | Hebbal - Sarjapur | 35.4km | Approved by State Govt. |
Line 2 (Green): Nagasandra - Silk Institute
| Phase | Project Cost | Funding By | ||
| Phase-I | ₹11,609 Crore | Govt. of India and Govt. of Karnataka |