India commissions 1,506-km dedicated freight railway corridor connecting JNPA to New Dadri
Exclusive Interview with Uwe Sperber, Site Manager, Hubner Interface Systems India
Bangalore Metro floated tender for 13.8-km Phase-3 Double-Decker Rail Infrastructure
AECOM–NIPPON KOEI JV appointed as PMC Consultant for Chennai Metro Phase 1 capacity enhancement
EPC Leader Larsen & Toubro Ltd (L&T) joins Chamber of Railway Industries as Corporate Member
Contractor prequalification deadline for Dubai Metro Gold Line is extended to October 9
Indore Metro Rail Network expands to 17 km as Priority Corridor 2 opened to public
Jaffer PC appointed as Managing Director of Bangalore Metro Rail Corporation (BMRC)
CMRL appoints Systra to prepare Multi-Modal Integration DPR for Chennai Metro Phase 1 stations
BEML secures additional ₹180.60 crore Rolling Stock Order for Vande Bharat Sleeper Trainsets
| Line | Routes | Length | Current Status | |||
| #1 Purple Line | Benniganahalli - Kengeri | 42.53km | Operational (39.34 km), U/C (1.54 km) | |||
| #2 Green Line | Nagasandra - Silk Institute - Yelachenahalli | 36.52km | Operational (30.32 km), U/C (6.2 km) | |||
| #3 Yellow Line | RV Road - Bommasandra | 19.14km | Under Construction | |||
| #4 Pink Line | Kalena Agrahara - Nagawara | 21.38km | Under Construction | |||
| #5 Blue Line | KR Puram - KIAL Terminals | 55.23km | Under Construction | |||
| #6 Orange Line | JP Nagar 4th Phase - Kempapura | 32.15km | Approved by State Govt. | |||
| #7 (TBA) | Hosahalli - Kadabagere | 12.5km | Approved by State Govt. | |||
| #8 (TBA) | Hebbal - Sarjapur | 35.4km | Approved by State Govt. |