J. Kumar Infraprojects achieves TBM Breakthrough at Mahipalpur for Delhi Metro Phase IV
DPR submitted for 671 km Hyderabad–Pune–Mumbai High-Speed Rail Corridor
Former Railway Board Member Anil Kumar Khandelwal Joins Advisory Board of Rail Chamber
Govt proposes 270-km Orbital Rail Corridor to transform Regional connectivity in Delhi-NCR
Tamil Nadu approves ₹9,335 Crore Chennai Airport–Kilambakkam Metro Corridor
NCRTC to appoint General Consultant for Delhi–Panipat–Karnal Namo Bharat RRTS Corridor
The Role of Train Systems in Sustainable Public Transportation
Govt of India approves ₹20,667 crore Ahmedabad - Dholera Semi High Speed Rail Corridor
ICF signs ₹1,513 crore contract to supply Rolling Stock to Bengaluru Suburban Rail Project
Siemens wins ₹91.65 crore Telecom Contract for Kochi Metro Phase 2 Pink Line
| Line | Routes | Length | Current Status | |||
| #1 Purple Line | Benniganahalli - Kengeri | 42.53km | Operational (39.34 km), U/C (1.54 km) | |||
| #2 Green Line | Nagasandra - Silk Institute - Yelachenahalli | 36.52km | Operational (30.32 km), U/C (6.2 km) | |||
| #3 Yellow Line | RV Road - Bommasandra | 19.14km | Under Construction | |||
| #4 Pink Line | Kalena Agrahara - Nagawara | 21.38km | Under Construction | |||
| #5 Blue Line | KR Puram - KIAL Terminals | 55.23km | Under Construction | |||
| #6 Orange Line | JP Nagar 4th Phase - Kempapura | 32.15km | Approved by State Govt. | |||
| #7 (TBA) | Hosahalli - Kadabagere | 12.5km | Approved by State Govt. | |||
| #8 (TBA) | Hebbal - Sarjapur | 35.4km | Approved by State Govt. |